Construction Site RAMS Pack — Standard
Construction Site RAMS Pack | Method Statement, Risk Assessment and Site Induction
Description: The three documents required before work starts on any construction, highways, or arboriculture site. Structured to meet CDM 2015 requirements and written in plain English.
Generic RAMS are not acceptable. These templates are built to prompt site-specific information at every section, so your completed documents hold up to scrutiny from principal contractors, local authorities, and HSE inspectors.
What's included:
- Method Statement: Full template including project details, scope of work, sequence of operations, plant and equipment log, personnel and competency records, and emergency arrangements
- Risk Assessment: Pre-structured hazard register with likelihood, severity, and residual risk rating system built in. Covers the most common construction and arb site hazards with space to add site-specific entries
- Site Induction and Site Rules: A 12-topic induction checklist with space for site-specific information, site rules summary, and a full operative sign-off sheet
Format: HTML file, open in any browser and print to PDF. A4, print-ready.
Who it's for: Construction subcontractors, arboriculture and highways teams, self-employed operatives, and any business that needs to submit RAMS to a principal contractor or client.