Your Cart
Loading

Man-Machine-Cycle-Time-Reduction-A-Detailed-Playbook - Level 1

On Sale
ZAR5.00
Pay what you want: (minimum ZAR5.00)
ZAR
Added to cart

Summary – Man-Machine Cycle Time Reduction Playbook (Level 1)

This playbook provides a structured framework for reducing man-machine cycle times in manufacturing, where operators and machines work together. Cycle time is the workstation’s “pulse,” made up of machine processing (65–80%), manual operations (10–20%), and short transitions/delays (5–10%). Unlike takt or lead time, it measures operator-machine efficiency.

Why it matters: Cutting cycle time improves productivity (20–30%), throughput (25–35%), delivery speed (40%), lowers costs, and boosts profitability by 10–15%. Top performers reduce manual work to 6–8% and increase machine efficiency to 85–90%.

Key improvement levers are being discussed as well as the 7-Step Framework.

Results & Benchmarks: Real cases (ABB, Daimler, Schneider Electric, Continental) show 27–35% cycle time cuts, 15–17% OEE gains, 34% faster processing, 52% more capacity, and multi-million-dollar savings.

Sustainability: Achieved via leadership commitment, data-driven monitoring, skilled teams, balanced KPIs, and robust review processes to prevent regression.

You will get a PDF (2MB) file