Setup-Time-Reduction-A-Comprehensive-Playbook - Level 1
Setup Time Reduction: Comprehensive Playbook – Level 1 (Summary)
This playbook is a practical guide to cutting setup times in manufacturing—often by 50–90%—to boost flexibility, capacity, and quality while reducing costs and inventory. It focuses on SMED (Single Minute Exchange of Dies), a proven Toyota method for converting internal setup tasks (machine stopped) to external tasks (machine running).
Why it matters:
- Capacity: Lead times cut up to 43%
- Cost: Manufacturing costs down over 20%
- Quality: Defects down 68%
- Inventory: WIP cut by 91%
Core concepts:
Tools & Techniques:
Implementation Roadmap:
Results from case studies:
- 60% setup time reduction (28.7 → 11.4 min)
- 25% more production capacity
- 37.5% less WIP inventory
- 12% OEE improvement
Sustainment strategies:
Goal: Faster changeovers, more flexible production, and lasting operational excellence without major capital spend.