Your Cart
Loading

Scrap-Reduction-Due-to-Inconsistent-Process-Control - Level 2

On Sale
ZAR5.00
Pay what you want: (minimum ZAR5.00)
ZAR
Added to cart

Scrap Reduction Due to Inconsistent Process Control – Level 2

Unlock up to 45% scrap reduction and reclaim lost profit potential.

Inconsistent process control is the leading driver of scrap, eroding up to 40% of manufacturing profit potential. Industry data shows that poor control of critical parameters like temperature, pressure, and cycle time accounts for 42% of all scrap losses, costing mid-sized manufacturers $450K–$600K annually per line.

This playbook provides a proven, structured framework to identify, measure, and eliminate waste caused by process variability. Built on Lean, Six Sigma, and TPM principles, it delivers a 30–45% scrap reduction within 12 months and ROI of 3:1 to 8:1.

Key Focus Areas:

  • Standardization: Clear SOPs, visual work instructions, and controlled recipes reduce variation by up to 37%.
  • Real-Time Monitoring: IoT sensors, SPC charts, and automated alerts detect deviations before they create defects.
  • Operator Development: Certification programs and skills-based training cut OOC events by 62%.
  • Equipment Reliability: TPM-driven maintenance and calibration reduce machine-driven scrap by up to 35%.
  • Root Cause Analysis: 8D, FMEA, and 5-Why frameworks ensure sustainable corrective actions.
  • Material & Recipe Control: Automated recipe management and supplier quality systems prevent deviations that cause 23% of scrap.
  • Change Management: ISO-compliant systems ensure modifications don’t destabilize processes.

📊 Business Impact:

  • Reduce scrap by 30–45%
  • Achieve $275,000+ annual savings per line
  • Improve product consistency by 18%
  • Boost customer satisfaction by 22%
  • Increase OEE by 14+ points

By embedding standardized processes, predictive monitoring, skilled operators, and disciplined problem-solving, manufacturers can achieve world-class scrap performance (<0.5%), strengthen profitability, and secure long-term competitive advantage.

You will get a PDF (3MB) file