Your Cart
Loading

4PCS Car USB 48 LED RGB Lights Strip Interior Atmosphere Neon Lamp + IR Remote

On Sale
A$18.00
A$18.00
Added to cart

4LedStrip


Type:Remote Control LED Strip Lights

Material: PVC

Voltage: DC 5V

Power: 4.5W

Strip Light Quantity: 4PCS

LED Quantity:12 led x 4

Light Color: RGB

LED Life: 50000H

Waterproof Rate: IP44

Fitment: Universal Fit most cars

Install the line: USB socket can be.

Installation: paste up can be.

note:

1. Please do not install a place that hinders driving.

2. people leave, please turn off the power.


Package included:

4x LED Strip Light

1x Remote Control