Your Cart
Loading

Man-Machine-Cycle-Time-Reduction-A-Detailed-Playbook - Level 2

On Sale
ZAR5.00
Pay what you want: (minimum ZAR5.00)
ZAR
Added to cart

Summary – Man-Machine Cycle Time Reduction: Level 2

This playbook provides a structured framework to reduce man-machine cycle times in manufacturing, where operators and machines work together. Cycle time—the total time from loading raw material to finished part—drives OEE, capacity, and unit costs. In typical operations, manual tasks take 10–20%, machine processing 65–80%, and transitions/restarts 5–10%.

Why it matters:

Reducing cycle times by 15–40% can yield 10–15% higher margins, 25–35% more throughput, up to 60% lower WIP, and $87–$124 extra profit per production hour. Best-in-class plants cut manual work to 6–8% of cycle time and raise machine utilization to 85–90%, enabling millions in annual savings.

  • Key drivers of loss as well as Improvement principles are discussed.

With leadership commitment, data-driven monitoring, and skilled teams, plants can achieve 28–37% cycle reductions, 22% labor cost cuts, and 17% energy savings, sustaining gains long-term.

You will get a PDF (2MB) file