Free MOC Close-Out Checklist - Management of Change Quick Check (PDF)
Implemented is not the same as closed
A free one-page check to use before an MOC record is moved to Closed. It keeps two questions apart: is the physical change finished? and is the paperwork and follow-up finished? A modification can be fully implemented on plant while drawing updates, procedure revisions or training records are still open.
What’s included
- 10 checks covering pre-implementation actions, physical completion, temporary arrangements, post-implementation actions, drawings and registers, procedures, briefing records, evidence and open items
- Yes / No / N/A and notes columns
- A simple rule for when an MOC is implemented but not ready to close
- Sign-off block for reviewer and closure approval
- A4 PDF, ready to print or fill in
Who it’s for
MOC coordinators, process and process safety engineers, and SHE teams reviewing MOC records before closure.
Next step: track every MOC to closure
The MOC Tracker Pack (£29) tracks every MOC through implementation and post-implementation close-out: Excel register, pre- and post-implementation action trackers, status dashboard, a full 15-point close-out checklist and chasing-email templates. All seven packs are in the Process Safety Engineer Starter Toolkit (£59).
Important
A generic check provided free for internal support use. It does not replace your site MOC procedure, competent review or approval routes. Adapt it with a competent person before use.
Version 1.1. Questions or feedback: hazardopssafety@hotmail.com