Your Cart
Loading
Only -1 left

Checklist - Electronics New Product Introduction (NPI) in Contract Electronics Manufacturing

On Sale
$79.00
$79.00
Added to cart

An NPI readiness checklist covering seven categories - Gerber data, documents and BOM, assembly and fabrication drawings, tooling and fixtures, first article requirements, implementation status including DfM feedback and packaging, and regulatory and compliance verification including RoHS, REACH, UL, ITAR, and country-of-origin. 5 pages.


Includes progressive first-pass yield target tables defining ICT, FCT, and systems-level FPY benchmarks across pilot, low-rate, and full production phases. Defines the required NPI team composition with nine specific roles and their responsibilities.


NPI readiness sign-off with dual signatures. Reusable across every new program launch.


This document is delivered as an editable Word file (.docx) so you can customize it for your specific program requirements.

You will get a DOCX (42KB) file