How to Estimate Post-Construction Cleaning by Phase

A post-construction clean can take several visits, each with different work. Estimate crew time for the rough clean, final clean and touch-up separately. Add shared project costs once, then decide what the proposed price needs to cover.

Separate rough, final and touch-up work

List every included task by phase and area. A rough floor clean and a final floor clean may involve the same area at different speeds. Treat touch-ups as separate work, and agree how many return visits are included. Record who handles debris and which windows, surfaces or areas are excluded.

Use estimated crew time for each quantity

Choose a unit that makes sense for the task, such as a room, a pane or 1,000 square feet. If two people spend 30 minutes working together, budget 60 crew minutes. In this example, rough work takes 6 crew hours, final work takes 9, touch-ups take 2 and interior glass takes 1. Two more paid hours for setup and travel bring the project to 20 labor hours.

Calculate the price from the expected cost

At an illustrative loaded labor rate of $26.40, 20 hours cost $528. Add $305 for supplies, rentals, vehicle and disposal costs, and project overhead. Break-even is $833. For a 25% operating margin, divide $833 by 0.75 and round up to $1,110.67. Use the actual rates and scope for your project.

Put the scope and price into the quote

List the phases and tasks included, the access and timing you agreed on, the treatment of extra return visits and the proposed price. Keep the cost calculations in your internal workbook.

Open the worked estimate and sample client quote

Page 3 of the preview is a free fillable walkthrough. Enter the phase, area, quantity and crew minutes for each task, plus access and return-visit details.

See the editable Excel estimator

Open the free post-construction calculator

No email or download required.