Contingency, three quotes, progress payments and a budget by room: a simple system to stop your reno costs running away.
Tags: Renovation, Home Improvement, Budgeting, Australia, Building
General information only. This isn't financial, legal or building advice. Home building rules differ between states and territories, so check with your state's fair trading or consumer affairs body before signing a contract.
Almost everyone who has renovated has a story about the budget. The kitchen that ended up costing far more than planned, the rotten floorboards found under the old bathroom tiles, the "small change" that turned into a variation on the invoice. Renovations go over budget for predictable reasons: the scope creeps, hidden problems turn up, and costs get tracked in someone's head instead of on paper.
You can't control everything, but you can control how you plan. A clear budget by room, a contingency set aside from day one, three properly compared quotes, and payments that only follow completed work will keep most renovations close to plan.
Step 1: Decide what you're actually doing
Before you get a single quote, write down the scope room by room. What's being replaced, what's staying, and what finish level you want. "New kitchen" isn't a scope. "Replace cabinets and benchtops, keep the existing layout, new splashback, new oven and cooktop, keep the fridge" is.
A clear scope does two things. It lets builders quote on the same job so you can compare them fairly, and it gives you something to check every later change against.
Step 2: Build your budget by room and by trade
Break the job down into rooms, and within each room into trades and items:
- Demolition and rubbish removal
- Building and carpentry
- Plumbing and electrical
- Waterproofing and tiling
- Cabinetry and benchtops
- Fixtures, fittings and appliances
- Painting and flooring
- Council, design or certification fees, if they apply
Put a planned amount next to every line. When quotes come in, you'll see straight away which rooms or trades are pushing the total up.
Step 3: Add a contingency, and don't touch it
Hidden problems are the main reason renovations go over budget. Once walls and floors are opened up, you may find water damage, old wiring or structural issues that no one could see.
A contingency is money set aside for exactly that. A common rule of thumb is 10% to 20% of the works budget, with older homes and bigger jobs towards the higher end. Set it aside at the start, keep it separate, and only use it for genuine surprises, not upgrades you decide on halfway through.
Example: For a $40,000 bathroom and laundry renovation, a 15% contingency is $6,000 (example figures). The total amount to have available is $46,000.
Step 4: Compare three quotes properly
Getting three quotes is good practice, but comparing them is where the value is. Quotes can look very different because they include different things. Line them up side by side and check:
- Does each quote cover the full scope you wrote down?
- What's excluded? Look for things like rubbish removal, waterproofing certificates or appliance installation.
- Are there provisional sums or prime cost items (allowances that may change)?
- What's the payment schedule?
- How long will the job take?
- Is the builder licensed for this work? Check your state's licence register.
The cheapest quote isn't always the cheapest job. A quote with large allowances or many exclusions can end up costing more once the variations come in.
Step 5: Tie payments to completed work
Progress payments should follow work that's actually been done, not time on the job. In NSW, for example, the NSW Government says the maximum deposit a builder can ask for under home building law is 10% of the contract price, and that for jobs over $20,000 the builder must give you a home building compensation insurance certificate before asking for a deposit or any other payment under the contract. Its guidance also says progress payments in your contract should match work actually done.
Other states and territories have their own rules on deposits, contracts and home warranty insurance, so check yours before you sign.
Whatever the rules where you live, keep a schedule of every payment: the stage, the amount, the due date and whether the work has been checked. Don't pay early, and don't pay for a stage that isn't finished.
Step 6: Track every variation and every dollar
Changes happen. You decide on a bigger window, or the builder finds something behind a wall. Every variation should be written down and agreed in writing, with its cost, before the work is done.
Then record it against the room it belongs to. Once a week, compare actual spending with the budget for each room. If one room is running over, you'll know early enough to save somewhere else, perhaps a cheaper tile or keeping an existing vanity, instead of finding out at the final invoice.
A worked example
A bathroom and laundry renovation (example figures):
| Area | Budget | Actual so far | Remaining | |---|---|---|---| | Bathroom: demolition and building | $8,000 | $8,400 | –$400 | | Bathroom: plumbing and electrical | $7,500 | $6,900 | $600 | | Bathroom: waterproofing and tiling | $9,000 | $5,200 | $3,800 | | Bathroom: fixtures and vanity | $5,500 | $0 | $5,500 | | Laundry: cabinetry and fit-out | $6,000 | $0 | $6,000 | | Painting and finishing | $4,000 | $0 | $4,000 | | Works budget | $40,000 | $20,500 | $19,500 | | Contingency (15%) | $6,000 | $1,200 used | $4,800 |
Demolition ran $400 over, and a leak under the old shower used $1,200 of the contingency. Because both were recorded straight away, the owners still know they have $4,800 of contingency and $19,500 of works budget left, and can choose a cheaper vanity if they need to.
Common mistakes
- Starting without a written scope. Quotes can't be compared without one.
- No contingency. Hidden problems are normal, not bad luck.
- Choosing on price alone. Check exclusions and allowances.
- Paying ahead of the work. Payments should follow completed stages.
- Verbal variations. Get every change and its cost in writing.
Where to check the rules
Before you sign a building contract, check the guidance from your state or territory's fair trading or consumer affairs body. In NSW, the NSW Government's contracts for residential building work page explains deposits, progress payments and what a contract must include.
Want the planner already built?
I made a Renovation Budget Planner for Australian homeowners: costs by room and by trade, a contingency % set aside automatically, a side-by-side comparison of three builder quotes that picks out the lowest, a deposit and progress payment schedule with alerts, and overruns flagged in red. It works in Excel and Google Sheets, and it's A$15. It's a budgeting tool, not financial, legal or building advice.
If you'd like every planner in the store, the Mega Bundle of all 25 Australian templates is A$79.