consultant expert dr mohamed taha THE STANDARD SPECIFICATIONS ROADS, BRIDGES AND INCIDENTAL CONSTRUCTION
On Sale
$0.00
$9.99
consultant expert dr mohamed taha
THE STANDARD SPECIFICATIONS
ROADS, BRIDGES AND INCIDENTAL CONSTRUCTION
FORM 816
2004
MERGED WITH
SUPPLEMENTAL SPECIFICATIONS
JULY 2014
Division I
GENERAL REQUIREMENTS AND COVENANTS
Section Rev. Date
1.01 Definition of Terms & Permissible Abbreviations ...................... Jan 2014
1.02 Proposal Requirements and Conditions .......................................July 2014
1.03 Award and Execution of Contract...................... ..........................July 2014
1.04 Scope of Work .............................................................................
1.05 Control of the Work ..................................................................... Jan 2014
1.06 Control of Materials .....................................................................
1.07 Legal Relations and Responsibilities ...........................................July 2013
1.08 Prosecution and Progress ............................................................. Jan 2014
1.09 Measurement and Payment .......................................................... Jan 2014
1.10 Environmental Compliance ......................................................... Jan 2014
1.11 Claims ..........................................................................................July 2010
1.20 General Clauses for Facilities Construction ................................July 2014
Division II
CONSTRUCTION DETAILS
EARTHWORK
2.01 Clearing and Grubbing ...............................................................
2.02 Roadway Excavation, Formation of
Embankment and Disposal of Surplus
Material.....................................................................................Jan 2010
2.03 Structure Excavation ..................................................................
2.04 Cofferdam and Dewatering.........................................................Jan 2014
2.05 Trench Excavation......................................................................Jan 2010
2.06 Ditch Excavation ........................................................................
2.07 Borrow ........................................................................................
2.08 Free-Draining Material ..............................................................
2.09 Subgrade ....................................................................................
2.10 Water Pollution Control (Soil Erosion) .....................................
2.12 Subbase.......................................................................................July 2013
2.13 Granular Fill ...............................................................................
2.14 Compacted Granular Fill ............................................................
2.16 Pervious Structure Backfill........................................................July 2014
2.18 Sedimentation Control Bales ......................................................
2.19 Sedimentation Control System ...................................................
3.02 Rolled Granular Base .................................................................
Rev. July 2014
Section Rev. Date
3.03 Concrete Base..............................................................................Jan 2014
3.04 Processed Aggregate Base..........................................................July 2005
3.05 Processed Aggregate ...................................................................
SURFACE COURSES OR PAVEMENTS
4.01 Concrete Pavement......................................................................Jan 2014
4.03 Cold Reclaimed Asphalt Pavement ............................................
4.06 Bituminous Concrete...................................................................Jan 2005
4.14 Bituminous Surface Treatment ...................................................
4.15 Pressure Relief Joint ...................................................................
STRUCTURES
5.01 General Clauses............................................................................Jan 2014
5.03 Removal of and Alterations to Existing Bridges .........................July 2010
5.04 Railroad Protection .....................................................................
5.06 Retaining Walls, Endwalls and Steps...........................................Jan 2014
5.07 Catch Basins, Manholes and Drop Inlets .....................................July 2014
5.08 Shear Connectors ........................................................................July 2010
5.09 Welded Studs ..............................................................................July 2010
5.13 Polyvinyl Chloride Plastic Pipe ...................................................July 2013
5.14 Prestressed Concrete Members ................................................... Jan 2014
5.21 Elastomeric Bearing Pads .......................................................