Quality Pack: ITPs, Hold Points, Snagging & Handover
Find defects before they are covered up, not at handover. This pack gives small and medium contractors the quality system the big contractors use, in plain English: inspection and test plans, hold points that actually stop work until they are signed, non-conformance reports, a snagging list that tracks every item to close-out, a pre-handover checklist and an index for the handover / O&M file. Written and checked by Max Wensley, a working SMSTS site manager.
What’s included:
- QUAL00 Quality procedure – how the forms fit together
- QUAL01 Inspection and test plan (ITP) template
- 3 worked ITPs: groundworks and foundations, blockwork and brickwork, first-fix M&E
- QUAL05 Hold-point register and QUAL06 hold-point release form
- QUAL07 Non-conformance report (NCR) and QUAL08 NCR log
- QUAL09 Snagging list (Word) and QUAL13 Excel registers: snagging list, hold-point register and NCR log, with a summary sheet
- QUAL10 Pre-handover inspection checklist
- QUAL11 Handover and O&M file index
- QUAL12 Toolbox talk: Quality – right first time, with attendance sheet
- Completed examples (fictional site), printable blank PDFs and a Start Here guide
Word and Excel, A4, blank logo box and company fields, yellow fill-in boxes. One business licence. Acceptance criteria and tolerances must come from your specification, drawings, manufacturers and approvals; the templates do not set them. Adapt to your project and have it checked by a competent person.