Risk-Based Inspection (RBI) Assessment Report – Complete Calculation Package (API 580/581)
Description:
Professional RBI Assessment package combining a quantitative remaining-life calculation (from measured thickness and corrosion rate) with semi-quantitative POF/COF risk scoring per API 580 principles. Includes the full calculation workbook (Excel, live formulas — remaining life, POF scoring, COF scoring, risk matrix, and auto-generated recommended inspection interval) plus a formatted report (Word) documenting methodology, risk categories, and results. Ideal for inspection engineers, asset integrity teams, and reliability engineers needing a defensible basis for risk-prioritized inspection planning.
Disclaimer:
This document is a calculation template and methodology reference based on API RP 580 principles and API RP 581 methodology concepts. It is not a substitute for a complete, project-specific RBI assessment performed by a qualified inspection or corrosion engineer using the full applicable methodology and current code requirements. Remaining life, risk scores, and recommended inspection intervals generated from this template must be independently verified before use for inspection planning. No liability is accepted for equipment failure, damages, or losses arising from use of this document.