RAMS Pack, Brickwork & Blockwork
Risk Assessment & Method Statement, written to CDM 2015. Construction of brickwork and blockwork walls, including foundations/DPC level work, cavity walls, and associated pointing and finishing, in accordance with the project specification and structural drawings. Includes full method statement (mobilisation to handover), traffic-light risk assessment (65-85 hazards), COSHH, PPE, permits to work, and emergency procedures. Editable Word document, ready to brand and use.