Demolition, Strip-Out and Asbestos Management Pack - 18 Documents: Demolition Plan, Surveys, Exclusion Zones, Asbestos Management Plan, Licensing Decision Tool, Records and Completion Certificate to BS 6187:2011, CDM 2015 and CAR 2012 (Word + Excel, UK, 2
Demolition and soft strip planned, surveyed, permitted and recorded to BS 6187:2011, CDM 2015 regulation 20 and the Control of Asbestos Regulations 2012 - procedure, pre-demolition survey, demolition plan and method statement with a full worked example, exclusion zones, party wall survey, asbestos management plan, the licensable-or-not decision tool, non-licensed work and health records, unexpected discovery procedure, services isolation, waste, monitoring, inspections and the completion certificate.
The asbestos side is built from the regulations as written: the licensing decision tool works through regulation 3(2) and the HSE notifiable non-licensed work examples with four worked assessments; the non-licensed work record keeps the job, worker and health records regulation 22 requires for forty years; the encounter procedure gives the crew the stop-and-report steps for an unexpected discovery, with a worked example. The demolition plan for the fictional Ellerby House shows what a principal contractor expects to see - sequence, structural stability, exclusion and drop zones, services, waste, monitoring and the hold points - and the daily inspection carries a shift-release line.
What you get (18 documents, 23 files)
- DA-000 Index and How to Use This Pack
- DA-001 Demolition and Strip-Out Procedure
- DA-002 Pre-Demolition Structural and Condition Survey Checklist
- DA-003 Demolition Plan and Method Statement - Template
- DA-004 Demolition Plan and Method Statement - Worked Example - Ellerby House
- DA-005 Exclusion Zone and Drop Zone Plan - Template and Worked Example
- DA-006 Services Isolation and Disconnection Register
- DA-007 Asbestos Survey Review and ACM Removal Tracker
- DA-008 Asbestos Management Plan - Construction Phase - Template and Worked Example
- DA-009 Licensable or Non-Licensed Asbestos Work Decision Tool (four worked assessments)
- DA-010 Non-Licensed Asbestos Work Record and Health Record
- DA-011 Asbestos Encounter and Unexpected Discovery Procedure - Procedure and Form, with Worked Example
- DA-012 Waste Consignment and Transfer Note Register (with List of Waste codes)
- DA-013 Dust, Noise and Vibration Monitoring Log
- DA-014 Daily Demolition Inspection
- DA-015 Demolition Plant and Attachment Pre-Use Check
- DA-016 Party Wall and Neighbour Condition Survey - Template and Worked Example
- DA-017 Demolition Completion Certificate - Template and Worked Example
Verified against BS 6187:2011 (code of practice for full and partial demolition), CDM 2015 regulations 20, 27 and 28, the Control of Asbestos Regulations 2012 (regulations 2, 3, 9 and 22 read on legislation.gov.uk) with HSE L143 (2nd edition 2013), HSG264 (2nd edition 2012), HSG227 and the Asbestos Essentials task sheets, the Party Wall etc. Act 1996 (sections 1, 3 and 6), the Hazardous Waste Regulations 2005, the Digital Waste Tracking (England) Regulations 2026 and WM3; BS 5228-1 and -2:2009+A1:2014 and BS 7385-2:1993 for noise and vibration; HSE HSG47, HSG144, HSG151, HSG136 (3rd edition 2014), HSG210 and L22. Guide values marked "confirm against your copy" are flagged in the documents. The standards-cited sheet in the download lists every edition and the date it was checked.
Format: 14 Microsoft Word and 9 Excel files, A4, branded header and footer with document control, plus the DA-STD Standards Cited workbook. Edit freely for your own projects under the single-company licence included in the download.
What comes with every StructAssure pack
- 12 months of email support - ask how to apply any document to your project and a chartered construction professional answers.
- Free updates when standards change - every standard cited in the pack is on our watch list; when an edition changes, the revised documents are re-issued to your Payhip download page at no charge.
- Not as described? Put right or refunded - if a file is faulty or the pack is missing something the listing promised, email within 7 days and it will be corrected or refunded.
Built by StructAssure Ltd - Chartered construction and quality professionals (MCIOB, CQP MCQI, MAPM). Written against current British Standards and checked line by line before release.