Your Cart
Loading

Kobelco CK850-II Crawler Crane Operation & Maintenance Manual with CKE700 CKE800 Parts Catalog PDF - MKOBCK850.zip

On Sale
$35.00
$35.00
Added to cart

Full OPERATION & MAINTENANCE manual including the Parts catalog for the KOBELCO CK850-II Crawler Crane.


KOBELCO CK850-II, CKE800-1, CKE700-1 Electrical Wiring Diagram.pdf


S2GG24001ZE09 - KOBELCO CK850-II Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf


S3GG14012ZO05 - KOBELCO Crawler Crane CK850-II Parts Manual.pdf


S5GG00005ZE04 - KOBELCO CK850-II, CKE700, CKE800 Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf


PRODUCT DETAILS:


Total Pages: 1,533 pages


File Format: PDF (Internal Links, Bookmarked, Table of Contents, Searchable, Printable, high quality)


Language: English


TABLE OF CONTENTS


KOBELCO CK850-II, CKE800-1, CKE700-1 Electrical Circuit Chart....1


S2GG24001ZE09 - KOBELCO CK850-II Crawler Crane OPERATION & MAINTENANCE MANUAL....32


COVER....32


TABLE OF CONTENTS....34


IMPORTANT INFORMATION....40


1. SAFE OPERATING PRACTICES FOR MOBILE CRANES....50


2. OPERATION....70


2.1 TERMINOLOGY OF MACHINE EACH PART....70


2.2 LOCATIONS AND TERMS OF OPERATING CONTROLS....71


2.2.1 OPERATING SWITCHES....75


2.2.2 GAUGE CLUSTER....85


2.2.3 HANDLING THE AIR CONDITIONER....97


2.2.4 AM/FM RADIO (OPTION)....99


2.3 CRANE OPERATION....101


2.3.1 ADJUSTING THE OPERATOR'S SEAT....101


2.3.2 ADJUSTING THE CONTROL LEVER DIRECTION....101


2.3.3 STARTING AND STOPPING THE ENGINE....102


2.3.4 FUNCTION LOCK LEVER....106


2.3.5 PROPELLING OPERATION....107


2.3.6 SWINGING OPERATION....109


2.3.7 BOOM RAISING/LOWERING OPERATION....110


2.3.8 HOOK RAISING/LOWERING OPERATION....112


2.4 FREE FALL OPERATION....115


2.5 CLAMSHELL OPERATION....118


2.6 HANDLING OF HYDRAULIC TAGLINE (OPTION)....120


3. LOAD SAFETY DEVICE....122


3.1 ARRANGEMENT OF EQUIPMENTS....122


3.2 TYPE AND FUNCTIONS OF EQUIPMENTS....125


3.3 CONNECTING PROCEDURE OF WIRING....131


3.3.1 CRANE ATTACHMENT....131


3.4 FUNCTION OF CONTROLLER/MONITOR....136


3.5 OPERATING PROCEDURE OF CONTROLLER....140


3.5.1 SETTING SCREEN....141


3.5.2 SETTING OF THE CRANE CONFIGURATION....146


3.5.3 SELECTION OF MAIN/AUX. LIFTING....152


3.5.4 SETTING OF WORKING AREA LIMIT VALUE....153


3.5.5 SETTING OF THE TIME....156


3.6 WARNING ALARM AND AUTOMATIC STOP....158


3.6.1 ITEMS OF WARNING ALARM AND AUTOMATIC STOP....158


3.6.2 CONTENTS OF AUTOMATIC STOP....159


3.6.3 RELEASE OF AUTOMATIC STOP....161


3.7 INSPECTION....166


3.7.1 INSPECTION BEFORE RAISING THE BOOM AFTER ASSEMBLY OF ATTACHMENT IS COMPLETED....166


3.7.2 INSPECTION AFTER ERECTING THE ATTACHMENT....169


3.8 CAUTION FOR HANDLING THE LOAD SAFETY DEVICE....170


3.9 INDICATION OF ERRORS AND REMEDY....171


3.10 INDICATION OF MESSAGE AND ALARM....172


3.11 CONFIRMATION OF FUNCTION FOR LOAD SAFETY DEVICE....173


4. UNLOADING/LOADING THE BASIC MACHINE....174


4.1 UNLOADING THE BASIC MACHINE FROM THE TRAILER....175


4.2 LOADING THE MACHINE ON A TRAILER....175


5. ASSEMBLY/DISASSEMBLY OF BASIC MACHINE....176


5.1 EXTENDING/RETRACTING THE CRAWLERS....177


5.1.1 EXTENDING THE CRAWLERS....177


5.1.2 RETRACTING THE CRAWLER....180


5.2 ERECTING/LOWERING THE GANTRY....183


5.2.1 ERECTING THE GANTRY....183


5.2.2 LOWERING THE GANTRY....185


5.3 INSTALLATION, REMOVAL OF THE COUNTERWEIGHT (WHEN USING THE AUXILIARY CRANE)....186


5.3.1 INSTALLATION OF THE COUNTERWEIGHT....186


5.3.2 REMOVAL OF THE COUNTERWEIGHT....189


5.3.3 INSTALLING/REMOVING CARBODY WEIGHTS....190


5.4 INSTALLATION, REMOVAL OF THE COUNTERWEIGHT....191


5.4.1 SETTING OF LMI....191


5.4.2 PREPARATIONS FOR OPERATION....196


5.4.3 INSTALLATION PROCEDURES....201


5.4.4 DISASSEMBLY PROCEDURES....206


5.4.5 OPERATION OF CYLINDER WHEN SETTING LOW GANTRY POSITION (FIXATION OF TENSION BAR CONNECTION) (FIG. 5-25)....210


6. ASSEMBLY/DISASSEMBLY OF CRANE ATTACHMENT....212


6.1 ASSEMBLING THE ATTACHMENT....213


6.1.1 ARRANGEMENT OF BOOM/JIB/GUY LINE....213


6.1.2 INSTALLING THE BACKSTOPS....220


6.1.3 INSTALLING THE BOOM BASE....221


6.1.4 INSTALLING THE BACKSTOPS TO THE REVOLVING FRAME....222


6.1.5 INSTALLING THE UPPER SPREADER....222


6.1.6 REEVING THE WIRE ROPE INTO THE UPPER AND LOWER SPREADER....223


6.1.7 INSTALLING THE BOOM TIP....225


6.1.8 INSTALLATION OF THE BASIC GUY LINE....226


6.1.9 MAIN HOIST WIRE ROPE REEVING....226


6.1.10 CONNECTING THE INSERT BOOMS....229


6.1.11 INSTALLING THE CABLE ROLLERS....238


6.1.12 CONNECTING THE BOOM GUY LINES....238


6.1.13 CAUTION FOR CANTILEVER....240


6.1.14 ASSEMBLING THE JIB....240


6.1.15 REEVING OF REAR DRUM WIRE ROPE....244


6.1.16 INSTALLING THE AUXILIARY SHEAVE....246


6.1.17 REEVING THE REAR DRUM WIRE ROPE TO THE AUXILIARY SHEAVE....247


6.2 ERECTING THE ATTACHMENT....248


6.2.1 CONFIRMATION BEFORE ERECTING THE ATTACHMENT....248


6.2.2 ERECTING THE ATTACHMENT....249


6.3 LOWERING THE ATTACHMENT....251


6.3.1 LOWERING THE ATTACHMENT....252


6.4 DISASSEMBLING THE ATTACHMENT....253


6.4.1 TREATMENT OF OVERHOIST LIMIT SWITCH WIRING....253


6.4.2 WINDING UP THE FRONT DRUM/REAR DRUM WIRE ROPES....253


6.4.3 DISASSEMBLING THE JIB....254


6.4.4 REMOVING THE BOOM GUY LINE....255


6.4.5 DISASSEMBLING THE BOOM....256


6.4.6 REMOVING THE BOOM BASE....257


6.4.7 REMOVAL OF THE COUNTERWEIGHT....258


6.4.8 LOWERING THE GANTRY....258


6.5 CAUTION WHEN TRANSPORTING BOOM....259


7. WIRE ROPE....260


7.1 HANDLING OF WIRE ROPE....260


7.1.1 UNREELING METHOD OF WIRE ROPE....260


7.1.2 WINDING WIRE ROPE ONTO THE DRUM....261


7.1.3 INSTALLING THE ROPE SOCKET....262


7.1.4 SPECIFICATION OF WIRE ROPE....262


7.1.5 WIRE ROPE LENGTH....263


8. MAINTENANCE....266


8.1 CHECKS....271


8.1.1 CHECKS OF THE UPPER....271


8.1.1.1 CHECK OF UPPER DAILY OR EVERY 8 HOURS....273


8.1.1.2 CHECK OF UPPER MONTHLY OR EVERY 100 HOURS....278


8.1.1.3 CHECK OF UPPER SEMI-ANNUALLY OR EVERY 600 HOURS....282


8.1.1.4 CHECK OF UPPER WEEKLY OR EVERY 50 HOURS....283


8.1.2 CHECK OF LOWER....285


8.1.2.1 CHECK OF LOWER DAILY OR EVERY 8 HOURS....287


8.1.2.2 CHECK OF LOWER MONTHLY OR EVERY 100 HOURS....288


8.1.2.3 CHECK OF LOWER QUARTERLY OR EVERY 250 HOURS....290


8.1.2.4 CHECK OF LOWER SEMI-ANNUALLY OR EVERY 600 HOURS....290


8.1.3 CHECK OF ATTACHMENT....291


8.1.3.1 CHECK OF ATTACHMENT DAILY OR EVERY 8 HOURS....293


8.2 OIL/GREASE SUPPLY AND WATER SERVICE....299


8.2.1 UPPER LUBRICATION (INCL. WATER SUPPLY)....303


8.2.2 LOWER LUBRICATION....305


8.2.3 ATTACHMENT LUBRICATION....307


8.2.4 GREASE....309


8.2.5 ENGINE OIL....312


8.2.6 FUEL....313


8.2.7 COOLANT....314


8.2.8 HYDRAULIC OIL....316


8.2.9 GEAR OIL....318


8.3 CLEANING/WASHING/CHANGE OF FILTER ELEMENT AND STRAINER....323


8.4 CHECK OF BATTERY....333


8.5 ARRANGEMENT AND USE OF FUSE....336


8.6 OPERATION UNDER UNUSUAL CONDITIONS....338


8.7 MACHINE STORAGE....340


8.8 TIGHTENING TORQUE VALUES....341


8.9 SECURITY PARTS TO BE REPLACED PERIODICALLY....343


8.10 ADJUSTMENT....344


8.10.1 ADJUSTMENT OF FRONT AND REAR DRUM LOCKS....344


8.10.2 ADJUSTMENT OF BOOM DRUM LOCK....345


8.10.3 ADJUSTMENT OF THIRD DRUM LOCK....346


8.10.4 ADJUSTMENT OF CRAWLER SHOES....347


8.11 CONSUMABLE PARTS LIST....348


9. REFERENCE MATERIALS....354


9.1 SPECIFICATION....354


9.1.1 PERFORMANCE....354


9.1.2 OUTSIDE DIMENSIONS....354


9.2 DIMENSIONS AND WEIGHT OF EACH PARTS....356


9.2.1 BASE MACHINE....356


9.2.2 COUNTERWEIGHT....357


9.2.3 ATTACHMENT....358


9.3 STABILITY IN SWINGING AND TRAVELING....361


9.4 SYSTEM SCHEMATIC....362


9.4.1 HYDRAULIC SYSTEM SCHEMATIC....362


9.4.2 ELECTRICAL WIRING SCHEMATIC....363


S3GG14012ZO05 - KOBELCO Crawler Crane CK850-II Parts Manual....380


COVER....380


CONTENTS....386


CONTROL SYSTEM....0


CONTROL ASSY....395


CONTROL LEVER ASSY (BOOM / MAIN / AUX.)....399


CONTROL LEVER ASSY (SWING)(SWING)....403


CONTROL LEVER ASSY (CRAWLER)....407


CONTROL LEVER ASSY (PROPEL / FUNCTION LOCK)....409


REMOTE CONTROL VALVE INSTAL (BOOM / FRONT / REAR)....411


SWING LOCK ASSY....413


BRAKE PEDAL ASSY....417


GRIP ASSY....421


FLOOR PLATE ASSY....423


GRIP ASSY (BOOM)....425


PANEL ASSY....427


PANEL ASSY....429


PANEL ASSY (LEFT STAND)....431


PANEL ASSY (LEFT SIDE)....433


PANEL ASSY (BYPASS SWITCH)....434


PANEL ASSY (FREE FALL LAMP)....435


DRUM LOCK ASSY (FRONT / REAR)....437


DRUM LOCK ASSY (BOOM)....439


LUB.LINES (FRONT / REAR)....441


LUB.LINES (BOOM)....443


MONITOR INSTAL....444


WINCH SYSTEM (WITH FREE FALL)....0


WINCH INSTAL (WITH FREE FALL / FRONT)(WITH FREE FALL / REAR)....445


WINCH ASSY (FRONT)....449


WINCH ASSY (REAR)....453


REDUCTION UNIT ASSY....457


WINCH SYSTEM (WITHOUT FREE FALL)....0


WINCH INSTAL (WITHOUT FREE FALL / FRONT)(WITHOUT FREE FALL / REAR)....459


WINCH ASSY (FRONT)....463


WINCH ASSY (REAR)....465


REDUCTION UNIT....467


HYD. LINES, CONTROL....469


BOOM HOIST SYSTEM....0


WINCH INSTAL ASSY (φ16)(BOOM)....471


WINCH ASSY....473


SWING SYSTEM....0


SWING REDUCT INSTAL....475


SWING MOTOR ASSY....477


SWING REDUCTION ASSY....479


SWING BEARING ASSY....483


SWING BEARING LUB. LINES....485


LINES....0


PUMP HYD. LINES (SUCTION)....487


PUMP HYD. LINES (CONTROL)....489


PUMP HYD. LINES (DELIVERY)....491


RIGHT DECK HYD. LINES....493


MAIN VALVE HYD. LINES....499


GANTRY CYLINDER HYD. LINE....503


SWING CONTROL HYD. LINES....507


ACCUMLATOR HYD. LINES....511


FLOOR CONTROL HYD. LINES ....513


FLOOR CONTROL HYD. LINES....517


CONNECTOR ASSY (GANTRY VALVE)....519


BRAKE CONTROL HYD. LINES....521


VALVE INSTAL....523


3-SECTION VALVE HYD. LINES....525


RETURN HYD. LINES....527


DRAIN LINES....529


RETURN BLOCK HYD. LINES....533


2-SECTION VALVE INSTAL....535


2-SECTION VALVE INSTAL (FUNCTION CUT / SWING PARKING BRAKE)....537


4-SECTION VALVE HYD. LINES....539


5-SECTION VALVE HYD. LINES....543


8-SECTION VALVE HYD. LINES....547


WINCH HYD. LINES (FOR FRONT & REAR DRUM)....549


WINCH HYD. LINES (FOR BOOM DRUM)....553


VALVE INSTAL....555


OIL COOLER HYD. LINES....559


CLAMP ASSY....561


LOWER HYD. LINES....563


SWIVEL JOINT INSTAL....565


SWIVEL JOINT....569


HYD. OIL TANK ASSY (FOR STANDARD)(FOR FREE FALL)(TANK)....571


HYD. OIL COOLING LINES....575


POWER PLANT....0


POWER PLANT ASSY....581


PUMP ASSY....587


POWER DIVIDER....589


MUFFLER INSTAL....593


FUEL LINES....595


RADIATOR INSTAL....599


AIR CLEANER INSTAL....601


FUEL TANK ASSY....603


ELECTRIC SYSTEM....0


ELEC ASSY (R.H. DECK)....607


ELEC ASSY (REV. FRAME)....613


ELEC ASSY (FLOOR PLATE)....617


RELAY BOX ASSY....621


ELEC ASSY (L.H. GUARD)....623


ELEC ASSY (CAB)....625


ELEC ASSY (L.H. DECK)....629


WASHER TANK ASSY....633


WASHER TANK ASSY....635


BATTERY INSTAL....637


JUNCTION BOX ASSY....639


RELAY ASSY....641


CAB / GUARD / PLATFORM ....0


CAB INSTAL....643


CAB ASSY....647


DOOR ASSY....655


RUBBER SHEET INSTAL (OPERATOR’S ROOM)....661


WIPER ASSY (FRONT WINDOW LOWER)....663


SUN VISOR ASSY....665


ROLL BLIND....667


SASH ASSY....669


R.H. GUARD INSTAL....671


R.H. GUARD ASSY....673


L.H. GUARD INSTAL....677


L.H. GUARD ASSY....681


COVER ASSY....685


INSULATION ASSY....687


INSULATION ASSY (L.H. GUARD)....691


DRUM COVER....693


SWING BEARING COVER....697


UNDER COVER ASSY....699


R.H. DECK ASSY....701


R.H. DECK INSTAL (UNDER OF CAB)....705


STEP ASSY....707


L.H. DECK INSTAL....709


GUARD ASSY (FRONT)....713


BOOM DRUM COVER ASSY....715


COVER ASSY (SWING FRAME)....717


COVER ASSY....719


LOWER SYSTEM....0


PROPEL MOTOR ASSY....721


REDUCTION UNIT ASSY....723


IDLER ASSY....725

You will get the following files:
  • TXT (506B)
  • URL-LINK (506B)