Contractor Project Pack, Curtain Walling & Glazing
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of curtain walling systems and glazing (unitised or stick system), including structural framing, glazing units, gaskets and weatherproofing, in accordance with the manufacturer's system specification and structural design. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.