Contractor Project Pack, Intumescent Coatings
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Application of intumescent fire protection coatings to structural steelwork, providing fire resistance by expanding to insulate steel from heat in the event of fire, in accordance with the project's fire engineering requirements and manufacturer's certified system. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.