Contractor Project Pack, Ceramic Wall & Floor Tiling
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of ceramic/porcelain wall and floor tiles, including surface preparation, tile adhesive fixing, grouting and sealing, in accordance with the project specification and manufacturer's system. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.