Dependency Critical Path — Offline Utility
Find which dependencies determine the finish time of a small project. Enter task IDs, durations and dependencies to calculate earliest starts and critical tasks.
WORKED EXAMPLE: Task A takes 2 time units. B takes 3 units after A; C takes 1 unit after A. With unlimited parallel resources, completion takes 5 units and A then B is the critical path. This is a synthetic arithmetic example, not a delivery estimate for a real project.
Includes a local HTML utility with labeled inputs and JSON for structured data, a synthetic example, downloadable JSON results, usage notes, privacy notes and a single-user personal/commercial license. Unzip, open the HTML file, load the example and edit the task data. No subscription or telemetry in the utility.
Assumes unlimited parallel resources, no calendars and fixed durations. Critical paths depend on your inputs. This is arithmetic planning, not a managed project service. Interface input limit: 200,000 characters. Downloads contain input and output; review before sharing.
Try the FREE Stable Line Deduplicator in this store before buying. Release candidate: automated logic and simulated-interface checks passed; graphical browser compatibility remains unverified.