Contractor Project Pack, Raised Access Floors
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of raised access floor systems (pedestals, floor panels, understructure bracing) to provide a services void beneath the finished floor, in accordance with the manufacturer's system specification. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.