Contractor Project Pack, Groundworks
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Groundworks including excavation, foundations, sub-base preparation and associated earthworks, in accordance with the project specification and structural/civil engineering drawings. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.