Your Cart
Loading

Loading bay / alteration change checklist (7-step pre-use after alteration, PDF + Word)

On Sale
$12.00
$12.00
Added to cart

Added a hoist landing or loading bay after the scaffold was designed? Use this one-page checklist before the first load lands.


Seven pre-use checks cover the revised brief, the revised drawing, ties and braces removed for the opening, hoist mast ties and landing gates (where a hoist serves the bay), the updated site layout, and the post-alteration inspection and re-tag. Tick Yes / No / N/A, note initials, and record a clear outcome: ready for first load, hold, or return to the designer or competent person.


What you get:

- Printable one-page PDF checklist (A4)

- Editable Word version for your own logo and project fields


Who it is for: site managers, temporary works coordinators, HSE officers and scaffold supervisors on UAE projects where a hoist, loading bay or other alteration changes a scaffold already in design or in use.


A project template for your team. Your competent persons complete it and own the content. Approvals follow your project engineering office and authority process. Not an engineering approval, design check or certification.


Guidance reference (footer only): Dubai Municipality Safety Guide for Construction Works (2026). Confirm against the current edition for your project.


Format: PDF + DOCX. Instant download. Made by Scaff Project Solutions FZE.

You will get the following files:
  • PDF (51KB)
  • DOCX (38KB)