Consultant expert, Dr. Muhammad Taha Evaluation of Bassussarry Wastewater Treatment Plant after Upgrading with Membrane Bioreactor Technology
On Sale
$0.00
$6.99
Consultant expert, Dr. Muhammad Taha
Evaluation of Bassussarry Wastewater
Treatment Plant after Upgrading with Membrane
Bioreactor Technology
Master’s Thesis by
v
SUMMARY
Bassussarry wastewater treatment plant was a traditional activated sludge sewage system
designed to treat municipal wastewater from the nearby two communities Arcangues and
Bassussarry. Due to the population growth the plant was upgraded to increase the capacity from
3100 PE to 9370 PE. Due to the limited footprint and the stringent discharge demands the
treatment methodology was changed to membrane bioreactor technology. Alfa Laval
Copenhagen A/S was the company responsible for the installation of the filtration system.
The performance of the plant was evaluated during three weeks in the start up phase, and during
two weeks in a period close to the steady state conditions. The process, the filtration system and
energy consumption were the main focus in this investigation. The operation of the process was
evaluated according to the COD, SS, NH4-N, NO3-N, and TN effluent concentration and also for
the degree of bacteria reduction provided by the membranes. The microbial status was measured
in terms of CFU/100ml of E.coli, total coliform and total count. Moreover, the
nitrification/denitrification activity for the MBR biomass was measured and compared with the
activity rates measured for conventional activated sludge process. In the other hand, since
membranes process is a technology tagged as a high energy demanding, an energy consumption
assessment was made for the complete process.
Results from the analytical measurements showed that the process was close to reach all the
discharge required by the Direction departementale de l‟Equipement et de l‟Agriculture
Pyrenees-Atlantiques. The average COD and BOD effluent concentration were 29 mg/l and 3
mg/l providing 95% and 98% of removal efficiency respectively. The ammonium effluent
concentration was always lower than 0.5 mg/L. However, difficulties in the operation conditions
resulted on poor denitrification with consequently nitrate effluent concentration over 10 mg/l.
Bacteria measurements in the permeate were a little away from the expected for membrane
rejection ability. It was observed persistent presence of total coliform, having an average of 1600
CFU/100ml. The same was observed for total viable count which include quantification of
bacteria, yeast and mold giving an average in the effluent of 8750 CFU/100 ml.
The MBR modules Alfa Laval MFM300 was evaluated using recorded data of the first five
months of operation. Flux, permeability and transmembrane pressure 30 average graphs showed a
stable system that is able to operate at very low transmembrane pressure and achieve high
permeabilities on the membranes up to 1000 l/m2*h*bar. The filtration system was able to
withstand with an unexpected discharge occurred on 17th February that introduce into the system
a great amount of unknown substance and produce a rapid increase on the sludge load into the
plant. However, chemical cleaning was required to remove the deposition of foulants onto the
membranes surface and stabilized the filtration system.
vi
The approach for the power requirement for the electrical installations marked a moderate energy
consumption of 1 kWh/m3 compared with similar technologies with similar abilities than the Alfa
Laval MBR technology. Still, the membranes are taking close to the 38% of the total energy
demand in the process.
الخبير الاستشاري الدكتور محمد طه
تقييم مياه الصرف الصحي باسوساري
محطة المعالجة بعد الترقية بالغشاء
تكنولوجيا المفاعلات الحيوية
رسالة الماجستير
الخامس
ملخص
كانت محطة باسوساري لمعالجة مياه الصرف الصحي نظامًا تقليديًا لتنشيط الحمأة
مصممة لمعالجة مياه الصرف الصحي البلدية من مجتمعات Arcangues و
باسوساري. نظرًا للنمو السكاني ، تم ترقية المصنع لزيادة السعة من
3100 PE إلى 9370 PE. نظرًا لمحدودية البصمة والتفريغ الصارم ، فإن
تم تغيير منهجية المعالجة إلى تقنية المفاعل الحيوي الغشائي. الفا لافال
كانت شركة Copenhagen A / S هي الشركة المسؤولة عن تركيب نظام الترشيح.
تم تقييم أداء المحطة خلال ثلاثة أسابيع في مرحلة بدء التشغيل وخلالها
أسبوعين في فترة قريبة من ظروف الحالة المستقرة. العملية ونظام الترشيح و
كان استهلاك الطاقة هو التركيز الرئيسي في هذا التحقيق. كان تشغيل العملية
تم تقييمها وفقًا لتركيز النفايات السائلة COD و SS و NH4-N و NO3-N و TN وأيضًا من أجل
درجة تقليل البكتيريا التي توفرها الأغشية. تم قياس الحالة الجرثومية
من حيث CFU / 100ml من بكتريا قولونية ، إجمالي القولون والعدد الكلي. وعلاوة على ذلك، فإن
تم قياس نشاط النترجة / نزع النتروجين للكتلة الحيوية MBR ومقارنتها مع
تم قياس معدلات النشاط لعملية الحمأة المنشطة التقليدية. من ناحية أخرى ، منذ ذلك الحين
عملية الأغشية هي تقنية تم تصنيفها على أنها تتطلب طاقة عالية ، واستهلاك للطاقة
تم إجراء تقييم للعملية الكاملة.
أظهرت نتائج القياسات التحليلية أن العملية كانت قريبة من الوصول إلى جميع
التفريغ المطلوب من قبل Direction Departementale de l Equipement et de l Agriculture
جبال البرانس أتلانتيك. كان متوسط تركيز النفايات السائلة COD و BOD 29 مجم / لتر و 3
ملغم / لتر يوفر 95٪ و 98٪ من كفاءة الإزالة على التوالي. نفايات الأمونيوم السائلة
كان التركيز دائمًا أقل من 0.5 مجم / لتر. ومع ذلك ، هناك صعوبات في ظروف العملية
أدى إلى ضعف نزع النتروجين وبالتالي تركيز نترات النترات السائلة أكثر من 10 ملغم / لتر.
كانت قياسات البكتيريا في النفاذية بعيدة بعض الشيء عن الغشاء المتوقع
القدرة على الرفض. لوحظ استمرار وجود القولونيات الكلية بمتوسط 1600
CFU / 100 مل. ولوحظ نفس الشيء بالنسبة للعد الكلي القابل للتطبيق والذي يشمل القياس الكمي لـ
البكتيريا والخميرة والعفن متوسط التدفق من 8750 CFU / 100 ml.
تم تقييم وحدات MBR Alfa Laval MFM300 باستخدام البيانات المسجلة لأول خمسة
أشهر من العملية. أظهر التدفق والنفاذية وضغط الغشاء 30 متوسط الرسوم البيانية أ
نظام مستقر قادر على العمل عند ضغط غشاء منخفض للغاية وتحقيق ارتفاع
نفاذية على الأغشية تصل إلى 1000 لتر / م 2 * ساعة * بار. كان نظام الترشيح قادرًا على ذلك
الصمود مع تفريغ غير متوقع حدث في 17 فبراير الذي تم إدخاله في النظام
كمية كبيرة من مادة غير معروفة وتنتج زيادة سريعة في حمأة الحمأة في
مصنع. ومع ذلك ، كان التنظيف الكيميائي مطلوبًا لإزالة ترسب الشوائب على
سطح الأغشية واستقرت نظام الترشيح.
السادس
تميز نهج متطلبات الطاقة للتركيبات الكهربائية بطاقة معتدلة
باستهلاك 1 كيلو واط / متر مكعب مقارنة بالتقنيات المماثلة بقدرات مماثلة من Alfa
تقنية Laval MBR. ومع ذلك ، فإن الأغشية تأخذ ما يقرب من 38٪ من إجمالي الطاقة
الطلب في هذه العملية.
Evaluation of Bassussarry Wastewater
Treatment Plant after Upgrading with Membrane
Bioreactor Technology
Master’s Thesis by
v
SUMMARY
Bassussarry wastewater treatment plant was a traditional activated sludge sewage system
designed to treat municipal wastewater from the nearby two communities Arcangues and
Bassussarry. Due to the population growth the plant was upgraded to increase the capacity from
3100 PE to 9370 PE. Due to the limited footprint and the stringent discharge demands the
treatment methodology was changed to membrane bioreactor technology. Alfa Laval
Copenhagen A/S was the company responsible for the installation of the filtration system.
The performance of the plant was evaluated during three weeks in the start up phase, and during
two weeks in a period close to the steady state conditions. The process, the filtration system and
energy consumption were the main focus in this investigation. The operation of the process was
evaluated according to the COD, SS, NH4-N, NO3-N, and TN effluent concentration and also for
the degree of bacteria reduction provided by the membranes. The microbial status was measured
in terms of CFU/100ml of E.coli, total coliform and total count. Moreover, the
nitrification/denitrification activity for the MBR biomass was measured and compared with the
activity rates measured for conventional activated sludge process. In the other hand, since
membranes process is a technology tagged as a high energy demanding, an energy consumption
assessment was made for the complete process.
Results from the analytical measurements showed that the process was close to reach all the
discharge required by the Direction departementale de l‟Equipement et de l‟Agriculture
Pyrenees-Atlantiques. The average COD and BOD effluent concentration were 29 mg/l and 3
mg/l providing 95% and 98% of removal efficiency respectively. The ammonium effluent
concentration was always lower than 0.5 mg/L. However, difficulties in the operation conditions
resulted on poor denitrification with consequently nitrate effluent concentration over 10 mg/l.
Bacteria measurements in the permeate were a little away from the expected for membrane
rejection ability. It was observed persistent presence of total coliform, having an average of 1600
CFU/100ml. The same was observed for total viable count which include quantification of
bacteria, yeast and mold giving an average in the effluent of 8750 CFU/100 ml.
The MBR modules Alfa Laval MFM300 was evaluated using recorded data of the first five
months of operation. Flux, permeability and transmembrane pressure 30 average graphs showed a
stable system that is able to operate at very low transmembrane pressure and achieve high
permeabilities on the membranes up to 1000 l/m2*h*bar. The filtration system was able to
withstand with an unexpected discharge occurred on 17th February that introduce into the system
a great amount of unknown substance and produce a rapid increase on the sludge load into the
plant. However, chemical cleaning was required to remove the deposition of foulants onto the
membranes surface and stabilized the filtration system.
vi
The approach for the power requirement for the electrical installations marked a moderate energy
consumption of 1 kWh/m3 compared with similar technologies with similar abilities than the Alfa
Laval MBR technology. Still, the membranes are taking close to the 38% of the total energy
demand in the process.
الخبير الاستشاري الدكتور محمد طه
تقييم مياه الصرف الصحي باسوساري
محطة المعالجة بعد الترقية بالغشاء
تكنولوجيا المفاعلات الحيوية
رسالة الماجستير
الخامس
ملخص
كانت محطة باسوساري لمعالجة مياه الصرف الصحي نظامًا تقليديًا لتنشيط الحمأة
مصممة لمعالجة مياه الصرف الصحي البلدية من مجتمعات Arcangues و
باسوساري. نظرًا للنمو السكاني ، تم ترقية المصنع لزيادة السعة من
3100 PE إلى 9370 PE. نظرًا لمحدودية البصمة والتفريغ الصارم ، فإن
تم تغيير منهجية المعالجة إلى تقنية المفاعل الحيوي الغشائي. الفا لافال
كانت شركة Copenhagen A / S هي الشركة المسؤولة عن تركيب نظام الترشيح.
تم تقييم أداء المحطة خلال ثلاثة أسابيع في مرحلة بدء التشغيل وخلالها
أسبوعين في فترة قريبة من ظروف الحالة المستقرة. العملية ونظام الترشيح و
كان استهلاك الطاقة هو التركيز الرئيسي في هذا التحقيق. كان تشغيل العملية
تم تقييمها وفقًا لتركيز النفايات السائلة COD و SS و NH4-N و NO3-N و TN وأيضًا من أجل
درجة تقليل البكتيريا التي توفرها الأغشية. تم قياس الحالة الجرثومية
من حيث CFU / 100ml من بكتريا قولونية ، إجمالي القولون والعدد الكلي. وعلاوة على ذلك، فإن
تم قياس نشاط النترجة / نزع النتروجين للكتلة الحيوية MBR ومقارنتها مع
تم قياس معدلات النشاط لعملية الحمأة المنشطة التقليدية. من ناحية أخرى ، منذ ذلك الحين
عملية الأغشية هي تقنية تم تصنيفها على أنها تتطلب طاقة عالية ، واستهلاك للطاقة
تم إجراء تقييم للعملية الكاملة.
أظهرت نتائج القياسات التحليلية أن العملية كانت قريبة من الوصول إلى جميع
التفريغ المطلوب من قبل Direction Departementale de l Equipement et de l Agriculture
جبال البرانس أتلانتيك. كان متوسط تركيز النفايات السائلة COD و BOD 29 مجم / لتر و 3
ملغم / لتر يوفر 95٪ و 98٪ من كفاءة الإزالة على التوالي. نفايات الأمونيوم السائلة
كان التركيز دائمًا أقل من 0.5 مجم / لتر. ومع ذلك ، هناك صعوبات في ظروف العملية
أدى إلى ضعف نزع النتروجين وبالتالي تركيز نترات النترات السائلة أكثر من 10 ملغم / لتر.
كانت قياسات البكتيريا في النفاذية بعيدة بعض الشيء عن الغشاء المتوقع
القدرة على الرفض. لوحظ استمرار وجود القولونيات الكلية بمتوسط 1600
CFU / 100 مل. ولوحظ نفس الشيء بالنسبة للعد الكلي القابل للتطبيق والذي يشمل القياس الكمي لـ
البكتيريا والخميرة والعفن متوسط التدفق من 8750 CFU / 100 ml.
تم تقييم وحدات MBR Alfa Laval MFM300 باستخدام البيانات المسجلة لأول خمسة
أشهر من العملية. أظهر التدفق والنفاذية وضغط الغشاء 30 متوسط الرسوم البيانية أ
نظام مستقر قادر على العمل عند ضغط غشاء منخفض للغاية وتحقيق ارتفاع
نفاذية على الأغشية تصل إلى 1000 لتر / م 2 * ساعة * بار. كان نظام الترشيح قادرًا على ذلك
الصمود مع تفريغ غير متوقع حدث في 17 فبراير الذي تم إدخاله في النظام
كمية كبيرة من مادة غير معروفة وتنتج زيادة سريعة في حمأة الحمأة في
مصنع. ومع ذلك ، كان التنظيف الكيميائي مطلوبًا لإزالة ترسب الشوائب على
سطح الأغشية واستقرت نظام الترشيح.
السادس
تميز نهج متطلبات الطاقة للتركيبات الكهربائية بطاقة معتدلة
باستهلاك 1 كيلو واط / متر مكعب مقارنة بالتقنيات المماثلة بقدرات مماثلة من Alfa
تقنية Laval MBR. ومع ذلك ، فإن الأغشية تأخذ ما يقرب من 38٪ من إجمالي الطاقة
الطلب في هذه العملية.