Contractor Project Pack, Hoists
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation, operation, and maintenance of construction hoists (passenger and material) providing vertical access on multi-storey construction projects, in accordance with LOLER 1998 and BS 7212. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.