Your Cart
Loading

RAMS Pack, Temporary Electrics

On Sale
£49.00
£49.00
Added to cart

Risk Assessment & Method Statement, written to CDM 2015. Design, installation, testing and maintenance of temporary electrical distribution systems on construction sites, in accordance with BS 7671 and HSE guidance for construction site electrics. Includes full method statement (mobilisation to handover), traffic-light risk assessment (65-85 hazards), COSHH, PPE, permits to work, and emergency procedures. Editable Word document, ready to brand and use.


You will get a DOCX (270KB) file