Your Cart
Loading

Scaffolding Interface & Tower Scaffold RAMS Pack

On Sale
£25.00
£25.00
Added to cart

For builders and trades who work from scaffolds and put up mobile aluminium towers. It is not for scaffolding contractors erecting tube and fitting. The pack covers what the main contractor expects you to have: tower RAMS, safe use of a handed-over scaffold, loading bays, handover and inspection checklists (7-day and after bad weather), a scaffold and tower register, “do not alter” site rules with an alteration request form, four toolbox talks and a completed example. Written and checked by Max Wensley, a working SMSTS site manager.


What’s included:


  • SCF01 Mobile Aluminium Tower Scaffolds (follows the manufacturer’s manual)
  • SCF02 Working on a Scaffold
  • SCF03 Scaffold Handover and Inspection Checklists (handover, 7-day / after-weather inspection, daily pre-use check, tower inspection)
  • SCF04 Scaffold and Tower Register
  • SCF05 Scaffold Loading Bays and Loading Out
  • SCF06 Scaffold Rules – Do Not Alter (poster, briefing record, alteration request)
  • SCF-TBT Four toolbox talks, each with a sign sheet
  • A completed example, printable blank PDFs and a Start Here guide


Refers to the Work at Height Regulations 2005 and to the NASC guidance TG20 and SG4 by name only. MWM is independent of and not endorsed by NASC, CISRS or PASMA.

Every document has a blank logo box and company fields, yellow fill-in boxes and sign-off. Word files, A4. One business licence. Templates are a starting point: adapt them to each job and have them checked by a competent person.

You will get a ZIP (821KB) file