Your Cart
Loading

Contractor Project Pack, HVAC Installation

On Sale
£99.00
£99.00
Added to cart

The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of heating, ventilation and air conditioning plant, ductwork, pipework and controls, including first fix containment, plant lifting, pipework jointing/brazing, refrigerant handling and commissioning, in accordance with the project specification and manufacturer's system requirements. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.


You will get a DOCX (350KB) file