Equipment Substructure / BOM in SAP Plant Maintenance / PM02
A video and detail PDF to cover creation of Equipment substructure including BOM in SAP Plant Maintenance:
1) Review definitions and OEM documentation
2) Create document with the link – CV01N
3) Create Subassembly codes – MM01 / MMP1
4) Create First Level BOM – CS01
5) Create Second Level BOM – CS01
6) Link Equipment – IE02
7) Create Equipment BOM (FL BOM) if needed – IB01 (IB11)
8) Review how everything looks like – IH01