The Data Center Construction Handbook (PDF edition)
A data center is a building whose value depends on a date. On the same April morning a switchgear manufacturer announces a 12-week slip, the monthly cost report shows the project behind its planned curve, and a thousand workers are due on site by the summer. The lease says the first 24 MW must be ready on 1 November. That is the job.The Data Center Construction Handbook is a practitioner's guide to delivering hyperscale and colocation buildings, from the owner's side of the table: the stretch between the decision to build and the day the tenant takes the keys, and the people who run it. One fictional 48 MW building, BC1 at Harrowgate's Brennan Creek campus, is followed from design in 2024 to its integrated systems test in October 2026, and every figure comes from one model.Some of what the arithmetic shows: why a 560 million dollar budget is 11.67 million dollars per megawatt and why 38 percent of it is electrical; what a guaranteed maximum price covers and what owner-furnished equipment leaves with the owner; what earned value said at the April data date, an SPI of 0.93 and a CPI of 0.97, and what it could not see; why accepting a 12-week switchgear slip looks cheaper on the construction budget yet costs the developer 22.6 million dollars, against 3.1 million dollars for reallocating the second tranche's equipment; and how a contingency log turns into a forecast final cost.Current to 2026, with each real-world fact dated and sourced: the record North American construction pipeline reported by CBRE, Census Bureau construction spending on data centers, transformer lead times surveyed by Wood Mackenzie, the 2025 copper tariff, the OSHA incident rate, standard CMAR contract forms and the commissioning and electrical safety references. No engineering design manual, and no repetition of the catalog's books on data center development, operations or investment.The model is not described, it is supplied. A companion workbook rebuilds the case by live formula, and the checklists come as an editable document. The closing pages say where to find them.What you will be able to do:- Explain what an owner's construction team does and how it differs from the contractor's- Read a data center budget and its cost per megawatt- Choose a delivery model and review a guaranteed maximum price- Run a long-lead equipment register and protect the critical path- Tie the schedule to the lease delivery dates and price a week of delay- Control cost with commitments, forecasts, a contingency log and earned value- Handle change orders and value recovery options when a supplier slips- Run commissioning from factory witness tests to the integrated systems test- Hand a building to operations and prepare for data center construction interviewsSixteen chapters and four appendices: a guide to the workbook, the construction manager's toolkit of checklists and outlines, thirty-six interview questions with model answers, and a glossary of sixty terms.Written for project managers, project engineers, MEP managers, schedulers, cost managers, commissioning and supply chain managers on the owner's and the contractor's side; construction professionals moving into data centers from commercial, industrial or energy projects; developers, investors and lenders who need to understand how a building actually gets delivered; and candidates preparing interviews for data center construction roles. Part of The Private Markets Career Guides.
This edition: PDF, A5, 177 pages, DRM-free.