Your Cart
Loading

Suzuki Kizashi & Kizashi Sport 2009-2014 Workshop Repair Service Manual PDF - MSZKKZSH0914OPES.zip

On Sale
$25.00
$25.00
Added to cart

The complete digital edition of the official repair manual delivers service, upkeep, and troubleshooting guidance for the 2009-2014 Suzuki Kizashi and Kizashi Sport. Diagnostic and repair procedures are explained thoroughly so you can fix, maintain, rebuild, refurbish, or restore your car just as a trained technician would at a neighborhood garage. This affordable, high-quality manual arrives 100% complete and intact, with no pages omitted. It matches the factory shop manual that dealers rely on, and it's guaranteed to work perfectly while saving you valuable time.


This guide covering the 2009-2014 Suzuki Kizashi and Kizashi Sport is broken into separate sections. Every section focuses on a particular component or system and, beyond routine service procedures, provides directions for disassembly, inspection, and reassembly. A table of contents appears at the start of each section. Pages can be located quickly by category, and every page can be enlarged to reveal fine detail. The file comes in cross-platform PDF format, so it runs smoothly on virtually any device. No computer expertise is required to work with it.


EXCERPT:


2012-13 ENGINE Engine Mechanical - Kizashi


ENGINE VACUUM CHECK


1. Warm up engine to normal operating temperature.


2. For CVT model, place select lever in "P" and apply parking brake.


For M/T model, place gear shift lever in "Neutral" and apply parking brake.


3. Remove engine cover.


4. Remove PCV hose (1) from PCV valve (2).


5. Connect special tool to PCV hose (1).


Special Tool


A. 09915-67311


6. Close PCV valve (2) using tape (3) or the like.


Fig. 3: Connecting Special Tool To PCV Hose


7. Start engine and turn off all electric loads.


8. Read vacuum gauge at specified idle speed, see IDLE SPEED INSPECTION .


Vacuum specification (at sea level) Standard: -65 kPa (-0.66 kgf/cm2 , -9.43 psi, -0.65 bar) or less at specified idle speed


9. After checking, disconnect special tool from PCV hose.


10. Peel off tape from PCV valve.


11. Connect PCV hose to PCV valve.


12. Install engine cover.


VALVE CLEARANCE INSPECTION AND ADJUSTMENT


Inspection


1. Disconnect negative (-) cable at battery.


2. Remove cylinder head cover, see CYLINDER HEAD COVER REMOVAL AND INSTALLATION.


3. Insert socket wrench through service hole (2) of front fender lower lining (1). Turn crankshaft pulley (3) clockwise and align crankshaft pulley notch mark (5) with 0° (TDC) mark (4) of timing chain cover. Matchmark camshaft housing No. 1 (6) and exhaust camshaft timing sprocket (7) have to be aligned to each other.


Fig. 4: Turning Crankshaft Pulley


Fig. 5: Aligning Crankshaft Pulley Notch Mark With Timing Chain Cover


Fig. 6: Aligning Matchmark Camshaft Housing And Exhaust Camshaft Timing Sprocket


4. Measure valve clearances with feeler gauge using the following procedures.


a. Measure valve clearances of "A" valves as indicated in the following figure.


b. Turn crankshaft pulley 360° clockwise.


c. Measure valve clearances of "B" as indicated as valves in the following figure.


Fig. 7: Identifying Valve Clearances


...


Suzuki Kizashi/Kizashi Sport 2009-2014 Workshop Repair & Service Manual

You will get the following files:
  • TXT (513B)
  • URL-LINK (513B)