RAMS Pack, HVAC Installation
Risk Assessment & Method Statement, written to CDM 2015. Installation of heating, ventilation and air conditioning plant, ductwork, pipework and controls, including first fix containment, plant lifting, pipework jointing/brazing, refrigerant handling and commissioning, in accordance with the project specification and manufacturer's system requirements. Includes full method statement (mobilisation to handover), traffic-light risk assessment (65-85 hazards), COSHH, PPE, permits to work, and emergency procedures. Editable Word document, ready to brand and use.