Your Cart
Loading
Only -1 left

Rare Butterfly: Crochet Mesh Pattern For Woman's Hat, Summer Crochet Beanie Pattern, Instant Download Crochet Hair Net PDF, Spiral Design Chemo Hat Pattern

On Sale
$6.00
$6.00
Added to cart

This woman's hat, featuring a mesh pattern, is crocheted from the crown to the edges. The finished crochet cap fits loosely on the head, making it suitable for those who prefer a more relaxed fit without any pressure. The original design is sure to garner many compliments, and the simple stitches make this crochet beanie pattern accessible to most crafters.


Crochet lightweigh hat pattern "Rare butterfly" is designed for adult female (~22" / 56 cm circumference and 6.5" / 16.5 cm depth) and includes:

• Hook and yarn suggestions (original women's beanie is made of 100% cotton, Begonia by YarnArt)

• Crochet abbreviations in standard U. S. terms

• Gauge

• Written pattern

• Additional photos and measurements in progress


Stitches used: chain, slip stitch, single crochet, half double crochet, double crochet, treble crochet, double treble crochet, crab stitch, double crochet 3 stitches together.

Skills level: Intermediate.

Yarn: Begonia by YarnArt, Friends Cotton 8/4 by Hobbii, or Catania Fine by Schachenmayr (1.76 oz (50 g) / 185 yd (169 m) per skein).

Hook: 2-2.5 mm. 

Gauge: 32 dc x 12 rows = 4x4 inches (10x10 cm)


This is a crochet beanie pattern for English speaking users. This is a CROCHET PATTERN only, NOT a finished product! The pattern is a PDF file which will be available for downloading immediately after purchase.


This pattern is Copyright and designed by Veselunka. Please do not redistribute, transfer or sell the pattern or images, in part or in whole. Feel free to sell finished beanie made by you after this pattern.


HAPPY CROCHETING!

You will get a PDF (1MB) file

Customer Reviews

There are no reviews yet.