Contractor Project Pack, Temporary Electrics
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Design, installation, testing and maintenance of temporary electrical distribution systems on construction sites, in accordance with BS 7671 and HSE guidance for construction site electrics. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.