Contractor Project Pack, Brickwork & Blockwork
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Construction of brickwork and blockwork walls, including foundations/DPC level work, cavity walls, and associated pointing and finishing, in accordance with the project specification and structural drawings. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.