Contractor Project Pack, Roofing
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of roof coverings (flat/pitched, felt/single-ply membrane/tiles/slates as specified), including associated flashings, insulation and roof drainage, in accordance with the project specification and manufacturer's system. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.