Contractor Project Pack, Hot Works
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Specialist hot works operations (welding, cutting, grinding, torch-applied roofing) requiring dedicated fire risk management, typically for structural steel fabrication/alteration or roofing membrane application. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.