Your Cart
Loading

Package Scope of Work and Bid Levelling Pack

On Sale
$19.00
$19.00
Added to cart

Most package disputes start with one missing scope line: who supplies the access, who moves the material, who signs the handover. This pack gives you an 11-section scope of work template with an interface matrix, a bid-document checklist and a clarifications log, plus an Excel levelling sheet that puts three bids side by side against your scope lines. Written for main contractors and package managers on UAE projects. Editable Word and Excel, instant download.

Not included: pricing advice, legal review or engineering design.

You will get a ZIP (43KB) file