PROJECT TAMER PM Log (by LEEM, Inc.)
Twelve linked logs in one Excel workbook — a construction PM's logbook, built by a construction PM, for the tracking the big platforms demo around.
What's in the download
- Project-Tamer-MASTER.xlsx — the blank workbook, edition 2.9.22. This is the product.
- Project-Tamer-EXAMPLE-Desert-Willow.xlsx — the same edition, filled in with the fictional Desert Willow job described below, so you can poke at a working book before you start your own.
- Project-Tamer-README.txt — two-minute start notes, including how to set your own sheet password once your first job is set up.
What this is
Project Tamer PM Log is a project log system for construction project managers, built as a single Excel workbook. Twelve tabs, one per log, all of them fed from one header block on page one. You type the project facts once: client, contract amount, budgets, retainage rate, root path. Every log in the book carries them from there. Correct a fact once and the correction flows everywhere. Nothing is re-typed.
There are no macros in this workbook. None. It runs on formulas, dropdowns, and formatting, and that is deliberate: it opens clean, it asks for no permissions, and there is nothing in it you have to trust before you can use it.
The workbook is built protection-ready: formulas, totals, and structure are flagged locked, entry cells flagged open — so the day you switch on sheet protection with your own password (the README shows how), a stray paste from a helper cannot quietly break the math.
New in this edition: the Constraint Log (tab 5). The book now tracks what is blocking the work, not just the work.
The twelve tabs
1. Project Tracking. Page one, and the front door of the book. The header block holds the project identity, a client contact card (client phone, client PM phone, and both email addresses), the contract figures, and the PO and rental budgets. Below it sits the task list: percent complete, hours assigned, hours spent, hours earned, and hours remaining for every task, plus a Labor Factor for each one. Hours Spent fills itself in from the Labor Log. The JOB TOTALS band sits at the top of the task list, frozen, where you can always see it: percent complete, total hours, total remaining, and the project's Labor Factor.
2. Labor Log. Weekly entries by employee or crew, with a labor code for each line: Install, PM, Supervision, Programming and Startup, or Temp. The task on each line is picked from a dropdown built from the page one task list, so the names always match and the hours always land on the right task. The Hours Remaining for the picked task fills itself in beside the entry, so the person logging time can see the bucket draining. A Temp switch, off by default, keeps temp hours out of the task budgets until you turn it on.
3. Submittal Log. Auto-numbered submittals with status, dates submitted and answered, and a days-open count. The reviewer's stamp is a dropdown with exactly three values: Not approved, Approved, FIPO. Any stamp closes the item, dated or not. An item still open past 30 days shows its age in red.
4. RFI Log. The same skeleton as the Submittal Log, so learning one teaches you both. The Response is a dropdown with two stamps: Answered closes the item; Returned for more info keeps it open and keeps the days-open clock running.
5. Constraint Log. NEW. One row per thing standing in the work's way. Each constraint gets an auto-number (CON-001, CON-002…), a type from a dropdown — Design, Permitting & AHJ, Owner, Material & Procurement, Labor, Predecessor Work, Inspection, Weather, Other — the party responsible for clearing it, the date identified, and the date it is needed by. Enter the Date Cleared and the status closes itself; the days-open count freezes at the span it actually took, and the row stays on the page as the record — nothing is ever deleted. An item still open past its need-by date shows its days open in red.
6. Change Order Log. Each CO carries its amount and one of three statuses: Waiting approval, Notice to Proceed, or Approved. Only Approved change orders move the money. A Notice to Proceed moves men, not dollars: the Current Contract Value on page one does not change until the approval lands. Each approved CO earns an approval number in the order it was answered, and a running column shows the contract amount after every row, reconciling with page one to the penny. Every row also builds its own folder hyperlink from the root path on page one.
7. Billing Log. One row per monthly billing: amount billed, amount paid, and retainage held. Retainage computes itself from the rate on page one, and the cell stays unlocked, so when a partial release happens you type the real figure over the formula and the totals follow your number. Running totals track billed to date, paid to date, and retainage to date. Balance Due is what is left to bill against the current contract value, and the last column shows the percent of the contract billed.
8. Rental Equipment Log. One row per machine, with delivery date, call-off date, and each month's invoice amount. A unit that is still out highlights its own row. That is the forgotten-rental warning, and it is the reason this log exists: a rental with no call-off date is a silent leak every PM has paid for once. Per-machine totals roll into the job rental total, which page one checks against the rental budget.
9. Purchase Order Log. PO numbers build themselves: project number, cost code segment, and a three-digit sequence per cost code. Status runs Issued, Partial Rec., Received, Paid. Purchased By comes from a roster you fill in once. The amount total feeds the PO budget check on page one.
10. Subcontractor Log. Subcontract amount, the sub's approved change orders, payments made, and the balance after payment, with the last payment date beside it.
11. Project Notes. The reading page. Your notes, newest first. Nothing is typed on this page.
12. Notes Entry. The writing desk. Type each new note under the last one, with its date, and it appears at the top of the reading page on its own.
What it does while you work
- Totals at the top, frozen. The numbers you run the job by sit in a band at the top of page one and stay on screen while the task list scrolls under them.
- A traffic light on every task. The Labor Factor and the hours delta read green when a task is ahead, plain when it is on pace, and red when it is falling behind.
- Overspend alarms. The moment a task's Hours Spent passes its Hours Assigned, the cell turns red. Not at month end. The moment it happens.
- Logs that close themselves. Submittals, RFIs, and change orders close when the answer stamp lands, whether or not anyone remembered to type the date. Constraints close the day you enter the date they cleared.
- A date stamp in every date field. Click a date cell and the tip tells you: hold Ctrl and tap the semicolon key to stamp today's date. Every date field in the book carries the same tip.
- Print that looks like it came from a firm. Every tab is set to fit the page, with the project header, repeating title rows, and page numbers in the footer. Print any tab and hand it to a client.
- Room to work. The task list holds 300 tasks, the Labor Log 500 entries, each log 50 items, notes 400 entries.
A worked example
The book was built and tested against a filled example job, the Desert Willow Logistics Center, a $485,000 base contract. Three approved change orders later (two adds and one credit), the Current Contract Value on page one reads $503,000, and the running column in the Change Order Log lands on the same figure. The job stands at 44.0% complete with a Labor Factor of 1.06: the crew is slightly behind the hours, close enough to fix, early enough to matter. The Purchase Order Log totals $116,400 against a $120,000 budget, 97 percent spent, and the budget pair on page one shows it in yellow. Rentals total $20,230 against an $18,000 budget, shown in red, because one 19-foot scissor lift is still out with no call-off date. And the new Constraint Log shows seven constraints on the job — four cleared and kept on the page as the record, three still open, one of them past its need-by date with its days open showing red. That is the book doing its job on one page: contract, labor, purchasing, what is blocking the work, and the one machine quietly billing by the month, all visible at once.
The filled example ships in the download, alongside the blank master, so you can poke at a working book before you start your own. Its data is simulated — the job, the client, and the subcontractors are invented — and it is the same edition as the master.
What you need
Microsoft Excel 2016 or newer, Windows or Mac, Microsoft 365 welcome. The workbook is built and verified in desktop Excel.
Google Sheets and LibreOffice will open the file with reduced fidelity. They are not supported and not warranted. This is an Excel workbook, sold as one.
Price and license
$129. One purchase licenses one person.
The licensed user may copy the workbook for every project they personally work. No per-job fees, no project cap. If a coworker wants to try it, hand them a copy: try-outs are welcome. On the honor system, if they keep using it as their tool, they buy their own.
A copy belongs to its payer. If your company paid, the license is the company's seat: when you leave, it stays and passes to the next person in the seat. If you paid, the license is yours and follows you to your next company.
In the maker's words: "This wasnt free to make, and if it helps you, the buy in is modest."
One honest note about the sheet protection: it keeps the formulas safe from stray hands and honest mistakes. It is not a lockbox, and we do not sell it as one. The workbook ships with no passwords — if you want your copy locked down, the README walks you through setting your own.
Need it in another language?
Custom language editions of the workbook are built on commission. $199 for most languages, $299 for right-to-left and complex scripts — the fee includes the workbook. Spanish is first in line. Order through this page and we build your edition from the current master.
FAQ
How do I get the file? Instantly. When checkout completes, your download is on the confirmation page, and Payhip also emails you a receipt with the download link. Nobody mails you anything by hand, and you do not wait on us.
Does it contain macros? No. The workbook contains no macros, no add-ins, and no external links. Nothing to enable, no security prompt to click through. If Excel ever warns you about this file, you have the wrong file.
What version of Excel do I need? Microsoft Excel 2016 or newer, Windows or Mac, Microsoft 365 welcome.
Will it work in Google Sheets or LibreOffice? They open it with reduced fidelity. We do not support or warrant it in either. Buy it for Excel.
Can I use it on all my jobs? Yes. Your license covers every project you personally work, for as long as you work them. Copy the book per job and go.
Can my whole office use one copy? One purchase licenses one person. Try-outs are free and welcome; continued use means another purchase. That is the whole enforcement system: the honor system, stated plainly.
What about updates? If we find and fix a real defect in this edition, buyers of this edition get the corrected file at no charge, sent to the email address used at checkout. New editions with new features are separate products. (One exception already on the record: the Constraint Log is new in edition 2.9.22 — if you bought an earlier 2.9 edition of this listing, ask us and we will send you the current file.)
What is your refund policy? If the workbook will not open clean in a supported version of Excel, or a defect we cannot fix keeps you from using it, email us within 30 days of purchase and we will fix it or refund your purchase price — your choice. A defect fix is always free, at any time. Change of mind is not a refund ground: the license already lets a coworker hand you a copy to try, so please try it before you buy.
How do I start a new job with it? Copy the blank master, open it, and type the project facts once on page one — name, number, client, contract amount, budgets, retainage rate. Every log in the book picks them up from there. You never clear out the example; the master ships blank, and the filled example is a separate file for learning on.
What edition is this? Version 2.9.22 — the current build, and the first with the Constraint Log. The filled example in the download is the same edition, so everything it shows is the book you are buying.