Contractor Project Pack, Tower Crane Operations
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Erection, operation, climbing, and dismantling of tower cranes on construction sites, in accordance with LOLER 1998, BS 7121, and CPA guidance. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.