Contractor Project Pack, Mezzanine Floor Installation
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of a structural mezzanine floor, including setting out and fixing column base-plates, erecting columns and steelwork, installing beams and joists, laying and fixing decking, and installing edge protection, handrails and staircases, using MEWP access and appropriate lifting equipment in accordance with the mezzanine design and floor loading. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.