The Construction Superintendent (PDF edition)

On Sale
$19.99
$19.99
Added to cart

November 2026. The project superintendent of a general contractor closes the file of a county health building: substantial completion on 24 July 2026, two days before the original contract date, after a wet summer and windows that arrived 40 workdays late; 100 workers on site at the peak, 78,216 worker-hours, 742 punch items closed by 10 August 2026. None of it happened by luck. This book shows the arithmetic behind each decision.

The Construction Superintendent is a practitioner's guide to running a job site for a general contractor in the United States: the documents read before mobilization, the site logistics plan (fence, laydown, crane reach, parking, toilets), crews, production rates and worker-hours, the manpower curve, the three-week look-ahead and the weekly foremen's meeting, weekly production checks, the daily report as evidence, the superintendent's safety duties and the hazards that fill the log, OSHA recording and reporting, the recordable rate by the published formula, the field general conditions, weather and late deliveries measured in days and dollars, recovery options priced against the cost of delay, and the punch list run by zone to final completion. One fictional contractor and one fictional county building are followed from the notice to proceed to final completion, and every number comes from one model. Every form and rule is dated and paraphrased.

Some of what the arithmetic shows: why two masonry crews needing 37.5 days are on site for 38; why eleven rain days earned only 9 calendar days; why windows 40 workdays late cost 21 workdays at the finish; why a second drywall crew at $33,500 beat a temporary enclosure at $96,000; why the contractor's own rate of 10.72 sits above the site's 7.67; and why walking each zone left 222 punch items open at substantial completion instead of 742.

The model is not described, it is supplied. Six companion workbooks hold the crews and production checks, the logistics plan, the field general conditions, the delays and recovery options, the safety rates and the punch list, by live formula, each with a Checks sheet, and the check-lists come as an editable document. The closing pages say where to find them.

What you will be able to do:

  • Draw and size a site logistics plan before mobilization
  • Turn quantities and outputs into durations, crews and worker-hours
  • Run a three-week look-ahead and a weekly production check
  • Write a daily report that carries a weather or delivery claim
  • Apply the OSHA recording rules and compute the recordable rate
  • Price a delay and a recovery in days and dollars
  • Run a punch list zone by zone to final completion

Sixteen chapters in five parts and four appendices: a guide to the workbooks with seven exercises, five working check-lists, forty questions for an interview or a site review with model answers, and a glossary of sixty-two terms.

Written for superintendents and assistant superintendents of general contractors on commercial and institutional work, foremen moving up to the seat, and project managers who work beside them. It is not a software manual, and it leaves CPM scheduling, estimating, contract claims, state plans and workers' compensation to other books. The case, its contractor, its county and their figures are fictional teaching assumptions, not market norms; real-world forms and rules are dated as of November 2026. This book is for education only. It is not legal or safety advice. Part of The Private Markets Career Guides.

How this book was made: written with the help of artificial intelligence tools, under the author's direction; every figure was computed by a model and every rule was checked against its source.

This edition: PDF, A5, 194 pages, DRM-free.

You will get a PDF (1MB) file