Your Cart
Loading

Contractor Project Pack, Screeding

On Sale
£99.00
£99.00
Added to cart

The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of sand/cement or flowing screed to prepared substrates, including levelling, curing and preparation for following floor finishes, in accordance with the project specification. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.


You will get a DOCX (349KB) file