Civil Works BOQ & Quantity Take-off Kit — Excel
Most BOQ templates give you a blank table. This one gives you a working model. 26 connected sheets and over 6,200 live formulas covering the full civil scope — excavation, concrete, reinforcement, formwork, blockwork, plaster, waterproofing, tiling, painting, gypsum, anti-termite, handrails, testing and DPM. Enter every door once and it deducts itself from blockwork, plaster, paint and tiling, and sizes your lintels. Enter every room once and the floor tiles, wall tiles, skirting, paint and ceiling all read from it. Concrete is priced pour by pour with its own grade, waste and curing water, ordered in whole cubic metres, with pump mobilisation charged correctly below the minimum load. Steel is split by diameter and by floor — because 8 mm costs more per ton and mills don't deliver part loads — with a report that tells you whether to order in one delivery or floor by floor. And the procurement schedule separates what you need from what you must actually order: execution waste, handling loss, pack sizes and minimum-order warnings. Built by a civil engineer, from site reality. Includes a 5-page user guide. Instant download · lifetime access