The constraint on AI is no longer chips. It is power, land, and an energization date you can defend.

In the 2026 market a substation transformer quotes at 75 to 110 weeks. Every data center announcement rests on three things that have nothing to do with servers: acreage somebody controls, electricity a utility has agreed to deliver, and a date a tenant will underwrite. This handbook is a practical guide to assembling them. It covers the deal side of development, not facility engineering: no rack layouts, no cooling schematics.

Who this book is for

  • Commercial real estate developers and site selection professionals moving into digital infrastructure
  • Utility account managers, power marketers and resource planners moving to the customer side
  • Project finance, infrastructure and corporate development analysts underwriting developments

Inside, you will learn how to

  • Screen sites with a weighted scorecard that starts with explicit hard fails
  • Read a grid independently and write a power thesis before you buy land
  • Run the first utility conversation and read an interconnection schedule honestly
  • Bridge the gap with on-site power, and buy power through tariffs, contracts and hedges
  • Secure land, entitlements, water permits and incentives you can satisfy
  • Underwrite a development that survives an investment committee

Worked, not described

  • A 180 MW campus taken from screening to first energization over forty months, including the two things that went wrong.
  • Three business models on the same site: powered land, powered shell, and turnkey at $11 million per MW with a 10.86 percent yield on cost.
  • The levered return is 18.6 percent on a flat lease and 22.6 percent with a 3 percent escalator. A twelve-month energization slip costs 399 basis points; an 8 percent rent miss costs 257.

Tools included

A site screening scorecard, a first-utility-meeting guide, diligence and document checklists, a long-lead equipment tracker built around 2026 lead times, sixteen interview questions with model answers, and a glossary. Six Excel workbooks included accompany the book: the underwrite computed, a blank model for your own campus, forty self-marking questions and three further cases. Nothing is locked; download details are inside the book.

Part of The Private Markets Career Guides. Read next: The Infrastructure Investment Analyst, Private Equity Real Estate, The Private Credit Investor.

Educational content. Regulatory passages are dated; check the current state before relying on them.

This edition: PDF, 6 x 9 in, 195 pages, DRM-free. The free companion Excel workbooks for this book are at julianrsterling.com/datacenter.

You will get a PDF (1MB) file