P6 Schedule Library: 56 Logic-Linked Schedules (XER, MS Project XML, Excel)
56 complete, logic-linked schedules ready to import into Primavera P6 or Microsoft Project: gas plants, pipelines, offshore, LNG, power, renewables, buildings, roads, tunnels, marine, water, mining, shipbuilding, turnarounds and more. Every activity, relationship type, lag and calculated float, plus an Excel workbook with the logic explained. Use them as templates, for training, or to check your own logic.