Your Cart
Loading

Kobelco CK2000 CKE1800 Crawler Crane Operation & Maintenance Manual Parts Catalog PDF - MKOBCK2000.zip

On Sale
$35.00
$35.00
Added to cart

Full Operation and Maintenance Manual, including a Parts Catalog, covering the KOBELCO CK2000 and CKE1800 Crawler Cranes.


KOBELCO CK2000, CKE1800 Electrical Wiring Diagram.pdf


S2JC10003ZE09 - KOBELCO CK2000 Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf


S3JC00003ZO01 - KOBELCO CK2000 Crawler Crane Parts Manual.pdf


S5JC00002ZE05 - KOBELCO CK2000, CKE1800 Crawler Crane OPERATION & MAINTENANCE MANUAL.pdf


PRODUCT DETAILS:


Total Pages: 1,812 pages


File Format: PDF (Internal Links, Bookmarked, Table of Contents, Searchable, Printable, high quality)


Language: English


TABLE OF CONTENTS


KOBELCO CK2000, CKE1800 Electrical Circuit Chart....1


S2JC10003ZE09 - KOBELCO CK2000 Crawler Crane OPERATION & MAINTENANCE MANUAL....34


COVER....34


TABLE OF CONTENTS....36


IMPORTANT INFORMATION....42


1. SAFE OPERATING PRACTICES FOR MOBILE CRANES....72


2. OPERATION....92


2.1 TERMINOLOGY OF MACHINE EACH PART....92


2.1.1 CRANE ATTACHMENT....92


2.1.2 LUFFING JIB ATTACHMENT....93


2.2 LOCATIONS AND TERMS OF OPERATING CONTROLS....94


2.2.1 OPERATING SWITCHES....98


2.2.2 GAUGE CLUSTER CONFIGURATION....107


2.2.3 OPERATING THE AIR CONDITIONER....120


2.2.4 AM/FM RADIO (OPTION)....122


2.3 CRANE OPERATION....124


2.3.1 ADJUSTING THE OPERATOR'S SEAT....124


2.3.2 ADJUSTING THE CONTROL LEVER DIRECTION....124


2.3.3 STARTING AND STOPPING THE ENGINE....125


2.3.4 FUNCTION LOCK LEVER....128


2.3.5 PROPELLING OPERATION....129


2.3.6 SWINGING OPERATION....131


2.3.7 BOOM RAISING/LOWERING OPERATION....134


2.3.8 HOOK RAISING/LOWERING OPERATION....136


2.4 FREE FALL OPERATION....139


2.5 LUFFING JIB OPERATION....142


2.5.1 JIB RAISING/LOWERING OPERATION....143


2.5.2 HOOK HOIST DRUM CONTROL....145


2.6 HANDLING OF REEVING WINCH (OPTION)....147


3. LOAD SAFETY DEVICE....150


3.1 ARRANGEMENT OF EQUIPMENTS....150


3.2 TYPE AND FUNCTIONS OF EQUIPMENTS....154


3.3 CONNECTING PROCEDURE OF WIRING....160


3.3.1 CRANE ATTACHMENT....160


3.3.2 LUFFING ATTACHMENT....165


3.4 FUNCTION OF CONTROLLER/MONITOR....170


3.5 OPERATING PROCEDURE OF CONTROLLER....174


3.5.1 SETTING SCREEN....175


3.5.2 SETTING OF THE CRANE CONFIGURATION....181


3.5.3 SELECTION OF MAIN/JIB/AUX. LIFTING....186


3.5.4 SETTING OF WORKING AREA LIMIT VALUE....187


3.5.5 SETTING OF THE TIME....191


3.6 WARNING ALARM AND AUTOMATIC STOP....193


3.6.1 ITEMS OF WARNING ALARM AND AUTOMATIC STOP....193


3.6.2 CONTENTS OF AUTOMATIC STOP....195


3.6.3 RELEASE OF AUTOMATIC STOP....200


3.7 INSPECTION....207


3.7.1 INSPECTION BEFORE RAISING THE BOOM AFTER ASSEMBLY OF ATTACHMENT IS COMPLETED....207


3.7.2 INSPECTION AFTER ERECTING THE ATTACHMENT....213


3.8 CAUTION FOR HANDLING THE LOAD SAFETY DEVICE....214


3.9 INDICATION OF ERRORS AND REMEDY....215


3.10 INDICATION OF MESSAGE AND ALARM....216


3.11 CONFIRMATION OF FUNCTION FOR LOAD SAFETY DEVICE....218


4. ASSEMBLY OF THE MACHINE....220


4.1 STABILITY IN SWINGING AND TRAVELING....220


4.1.1 WITHOUT BOOM BASE....220


4.1.2 WITH BOOM BASE....222


4.2 TRANSLIFTER....223


4.2.1 COMPOSITION OF THE TRANSLIFTER....223


4.2.2 HANDLING TRANSLIFTERS (1) - (4)....224


4.3 UNLOADING THE BASE MACHINE....227


4.3.1 ERECTING THE GANTRY....228


4.3.2 SETTING THE TRANSLIFTERS....229


4.3.3 UNLOAD THE BASE MACHINE FROM THE TRAILER....232


4.3.4 INSTALLATION OF THE HOOK BLOCK TO THE BASE BOOM....233


4.4 INSTALLATION OF THE CARBODY WEIGHT....235


4.5 INSTALLATION OF THE CRAWLER....238


4.5.1 INSTALLATION OF THE FIRST CRAWLER....238


4.5.2 INSTALLATION OF THE SECOND CRAWLER....242


4.6 ASSEMBLING THE ATTACHMENT....244


4.6.1 ASSEMBLY OF THE BOOM....244


4.6.2 ASSEMBLY OF THE JIB....253


4.6.3 INSTALLATION OF THE AUXILIARY SHEAVE....259


4.7 ASSEMBLING THE LUFFING ATTACHMENT....260


4.7.1 ARRANGEMENT OF BOOM / LUFFING JIB / GUY LINE....262


4.7.2 CONNECTING LUFFING BOOM TIP ASSEMBLY....272


4.7.3 INSTALLING THE AUXILIARY SHEAVE FOR LUFFING....273


4.7.4 ASSEMBLING THE LUFFING JIB....274


4.7.5 INSTALLING STRUT GUY LINE....275


4.8 INSTALLATION OF THE COUNTERWEIGHT....276


4.8.1 ASSEMBLING THE COUNTERWEIGHTS....276


4.8.2 REMOVING THE HOOK BLOCK FROM THE BASE BOOM....279


4.8.3 SETTING THE COUNTER-WEIGHT LINK....280


4.8.4 INSTALLATION OF COUNTERWEIGHTS TO MACHINE....281


4.9 CONNECTING THE BOOM....286


4.9.1 CONNECTING THE BASE BOOM TO THE INSERT BOOM....286


4.9.2 INSTALLATION OF THE GUY LINE....287


4.10 ASSEMBLING THE LUFFING JIB ATTACHMENT....291


4.10.1 INSTALLING LUFFING JIB HOIST WIRE ROPE....291


4.10.2 CONNECTING STRUT GUY LINE....291


4.10.3 INSTALLING STRUT BACKSTOP....292


4.10.4 INSTALLING JIB GUY LINE....293


4.11 REEVING THE WIRE ROPE FOR CRANE, JIB AND AUXILIARY SHEAVE....294


4.11.1 REEVING THE FRONT DRUM WIRE ROPE FOR CRANE WITHOUT LUFFING JIB....294


4.11.2 REEVING REAR DRUM WIRE ROPE TO THE JIB....298


4.11.3 REEVING THE REAR DRUM WIRE ROPE TO THE AUXILIARY SHEAVE....300


4.12 REEVING THE WIRE ROPE FOR CRANE WITH LUFFING ATTACHMENT....301


4.13 ERECTING THE ATTACHMENT....304


4.13.1 CONNECTING THE SAFETY DEVICE (Refer to Chapter 3.)....304


4.13.2 CONFIRMATION BEFORE ERECTING THE ATTACHMENT....304


4.13.3 ERECTING THE ATTACHMENT....305


4.13.4 CHECK BEFORE STARTING THE WORK....306


4.14 ERECTING THE LUFFING ATTACHMENT....307


4.14.1 CONNECTING SAFETY DEVICE....307


4.14.2 CONFIRMATION BEFORE ERECTING THE LUFFING ATTACHMENT....310


4.14.3 ERECTING LUFFING ATTACHMENT....311


4.14.4 CHECK BEFORE STARTING THE WORK....314


5. DISASSEMBLY OF THE ATTACHMENT....316


5.1 LOWERING THE ATTACHMENT....318


5.1.1 LOWERING THE ATTACHMENT....318


5.2 LOWERING THE LUFFING ATTACHMENT....319


5.2.1 LOWERING THE ATTACHMENT....320


5.3 WINDING UP THE FRONT DRUM/REAR DRUM WIRE ROPES....323


5.4 REMOVING JIB GUY LINE....324


5.4.1 REMOVE THE JIB GUY LINE OF THE FRONT STRUT SIDE....324


5.4.2 REMOVE THE JIB GUY LINE OF THE REAR STRUT SIDE....325


5.5 DISCONNECTING THE WIRING FOR SAFETY DEVICE....327


5.6 REMOVING THE BOOM GUY LINE....330


5.6.1 INSTALLATION OF THE UPPER SPREADER TO THE BOOM BASE....330


5.6.2 REMOVE THE BOOM GUY LINE....330


5.7 REMOVE THE COUNTER-WEIGHTS....331


5.7.1 DISCONNECT THE BOOM BASE FROM THE INSERT BOOM....331


5.7.2 REMOVE THE COUNTERWEIGHTS FROM THE MACHINE....332


5.7.3 INSTALLATION OF THE HOOK BLOCK TO THE BOOM BASE....336


5.7.4 DISASSEMBLY OF THE COUNTERWEIGHT....337


5.8 DISASSEMBLING THE ATTACHMENT....339


5.8.1 DISASSEMBLING THE JIB....339


5.8.2 REMOVING GUY LINES....341


5.8.3 REMOVING UPPER AND INSERT BOOMS....342


5.9 DISASSEMBLY OF LUFFING ATTACHMENT....342


5.9.1 DISASSEMBLING THE LUFFING JIB....343


5.9.2 DISASSEMBLING THE LUFFING BOOM TIP ASSEMBLY....344


5.9.3 CAUTION WHEN TRANS-PORTING LUFFING BOOM TIP ASSEMBLY....345


5.10 REMOVAL OF THE CRAWLERS....346


5.10.1 SETTING THE TRANSLIFTER (Refer to 4.3.1.)....346


5.10.2 REMOVAL OF THE CRAWLERS....346


5.11 REMOVAL OF THE CARBODY WEIGHTS....351


5.12 REMOVAL OF THE HOOK BLOCK FROM BASE BOOM....352


5.13 LOADING THE BASE MACHINE....353


5.13.1 LOADING THE BASE MACHINE ON THE TRAILER....353


5.13.2 FOLDING THE TRANSLIFTER....353


5.13.3 LOWERING THE GANTRY....355


5.13.4 CAUTION WHEN TRANSPORTING THE BASE MACHINE....356


5.13.5 TRANSPORTATION OF NO.1 COUNTERWEIGHT AND LADDER....356


6. WIRE ROPE....358


6.1 UNREELING WIRE ROPE....358


6.1.1 UNREELING WIRE ROPE....358


6.1.2 WINDING WIRE ROPE ONTO DRUM....359


6.1.3 INSTALLING THE ROPES....361


6.1.4 SPECIFICATION OF WIRE ROPE....361


6.1.5 WIRE ROPE LENGTH....362


7. MAINTENANCE....366


7.1 INSPECTIONS....371


7.1.1 UPPER STRUCTURE PARTS AND DEVICES TO BE INSPECTED....371


7.1.1.1 UPPER STRUCTURE INSPECTIONS-DAILY OR EVERY 8 HOURS....373


7.1.1.2 UPPER STRUCTURE INSPECTIONS-MONTHLY OR EVERY 100 HOURS....378


7.1.1.3 UPPER STRUCTURE INSPECTIONS-SEMI-ANNUALLY OR EVERY 600 HOURS....382


7.1.1.4 UPPER STRUCTURE INSPECTIONS-WEEKLY OR EVERY 50 HOURS....383


7.1.2 LOWER STRUCTURE PARTS AND DEVICE TO BE INSPECTED....385


7.1.2.1 LOWER STRUCTURE INSPECTIONS-DAILY OR EVERY 8 HOURS....386


7.1.2.2 LOWER STRUCTURE INSPECTIONS-MONTHLY OR EVERY 100 HOURS....387


7.1.2.3 LOWER STRUCTURE INSPECTIONS-QUARTERLY OR EVERY 250 HOURS....389


7.1.2.4 LOWER STRUCTURE INSPECTIONS-SEMI-ANNUALLY OR EVERY 600 HOURS....389


7.1.3 ATTACHMENT PARTS AND DEVICES TO BE INSPECTED....391


7.1.3.1 ATTACHMENT INSPECTIONS-DAILY OR EVERY 8 HOURS....393


7.1.4 REPLACEMENT STANDARDS FOR WIRE ROPE....397


7.2 OIL/GREASE SUPPLY AND WATER SERVICE....402


7.2.1 UPPER STRUCTURE LUBRICATION (INCLUDING WATER SUPPLY)....405


7.2.2 LOWER STRUCTURE LUBRICATION....407


7.2.3 ATTACHMENT LUBRICATION....409


7.2.4 GREASE....411


7.2.5 ENGINE OIL....419


7.2.6 FUEL....420


7.2.7 COOLANT....421


7.2.8 HYDRAULIC OIL....423


7.2.9 GEAR OIL....426


7.3 CLEANING/WASHING/CHANGING FILTER ELEMENT AND STRAINER....431


7.4 BATTERY INSPECTION....442


7.5 LOCATION AND USE OF FUSE....445


7.6 OPERATION UNDER UNUSUAL CONDITIONS....447


7.7 MACHINE STORAGE....449


7.8 TIGHTENING TORQUE VALUES....450


7.9 SECURITY PARTS TO BE REPLACED PERIODICALLY....452


7.10 ADJUSTMENT....453


7.10.1 ADJUSTMENT OF FRONT AND REAR DRUM LOCKS....453


7.10.2 ADJUSTMENT OF BOOM DRUM LOCK....454


7.10.3 ADJUSTMENT OF THIRD (LUFFING JIB) DRUM LOCK....455


7.10.4 CRAWLER SHOES ADJUSTMENT....455


7.11 CONSUMABLE PARTS LIST....456


8. REFERENCE MATERIALS....462


8.1 SPECIFICATION....462


8.1.1 PERFORMANCE....462


8.1.2 PERFORMANCE OF LUFFING JIB....462


8.1.3 OUTSIDE DIMENSIONS....463


8.2 DIMENSIONS AND WEIGHT OF EACH PARTS....465


8.2.1 BASE MACHINE....465


8.2.2 COUNTERWEIGHT....466


8.2.3 ATTACHMENT....467


8.3 SYSTEM SCHEMATIC....473


8.3.1 HYDRAULIC SYSTEM SCHEMATIC....473


8.3.2 ELECTRIC SYSTEM SCHEMATIC....475


9. INITIAL ASSEMBLY OF THE MACHINE....490


9.1 UPPER STRUCTURE (WITH CARBODY) LIFTING PROCEDURES....491


9.1.1 INSTALLATION OF BOOM FOOT LIFTING BRACKET....491


9.1.2 INSTALLATION....492


9.2 LOADING/UNLOADING OF THE MACHINE FROM/ONTO A TRAILER....493


9.2.1 LOADING ONTO A TRAILER....493


9.2.2 UNLOADING FROM A TRAILER....493


9.3 INSTALLATION OF THE CARBODY WEIGHT....497


9.4 INSTALLATION OF THE CRAWLER....498


9.4.1 INSTALLATION OF THE FIRST CRAWLER....498


9.4.2 INSTALLATION OF THE SECOND CRAWLER....503


9.5 INSTALLATION OF THE GANTRY TO THE SWING FRAME....505


9.6 INSTALLATION OF THE BOOM BASE....508


9.6.1 REMOVAL OF THE BACKSTOP....508


9.6.2 INSTALLATION OF THE BOOM BASE....508


9.7 INSTALLATION OF THE BACKSTOP....510


9.8 INSTALLING THE UPPER AND LOWER SPREADER....511


S3JC00003ZO01 - KOBELCO CK2000 Crawler Crane Parts Manual....518


COVER....518


CONTENTS....523


CONTROL SYSTEM....0


MONITOR INSTAL....579


LUB. LINES FOR DRUM LOCK (BOOM)....577


LUB. LINES (FRONT / REAR)....575


DRUM LOCK ASSY (BOOM)....573


DRUM LOCK ASSY (FRONT / REAR)....571


LAMP & SWITCH ASSY (WITH FREE FALL)....569


PANEL ASSY (BYPASS SWITCH)....567


PANEL ASSY....565


PANEL ASSY (LEFT STAND)....563


LABEL ASSY....561


PANEL ASSY (LEFT STAND)....559


PANEL ASSY....557


BRAKE PEDAL ASSY....553


GRIP ASSY (BOOM)....551


SWING LOCK ASSY....549


REMOTE CONTROL V.INSTAL (BOOM / FRONT / REAR)....547


CONTROL LEVER ASSY (PROPEL / FUNCTION LOCK)....545


CONTROL LEVER ASSY (SWING)....541


CONTROL LEVER ASSY (BOOM / MAIN / AUX.)....537


CONTROL ASSY....533


WINCH SYSTEM (WITH FREE FALL)....0


WINCH INSTAL (WITH FREE FALL (FRONT / REAR)....581


WINCH ASSY (FRONT)....583


WINCH ASSY (REAR)....585


WINCH ASSY....587


WINCH SYSTEM (WITHOUT FREE FALL)....0


WINCH INSTAL (WITHOUT FREE FALL / FRONT & REAR)....589


WINCH INSTAL (FRONT)....591


WINCH ASSY (REAR)....595


REDUCTION UNIT ASSY....599


BOOM HOIST SYSTEM....0


WINCH INSTAL (BOOM)....603


WINCH ASSY....605


REDUCTION UNIT ASSY....607


SWING SYSTEM....0


REDUCTION INSTAL, SWING....609


SWING MOTOR ASSY....611


SWING REDUCTION ASSY....613


SWING BEARING ASSY....615


SWING BEARING LUB. LINES....617


LINES....0


PUMP HYD. LINES (SUCTION)....619


PUMP HYD. LINES (CONTROL)....621


PUMP HYD. LINES (DELIVERY)....625


RIGHT DECK HYD. LINES....627


MAIN VALVE CONTROL HYD. LINES....633


SWING MOTOR HYD. LINES....635


SWING MOTOR HYD. LINES (BLOCK)....639


ACCUMLATOR HYD. LINES....641


FLOOR PLATE HYD. LINES....643


FLOOR CONTROL HYD. LINES....645


BRAKE HYD. LINES....649


BRAKE CONTROL HYD. LINES....651


4-SECTION VALVE HYD. LINES....653


3-SECTION VALVE HYD. LINES....655


HYD.CONTROL LINES....657


DRAIN HYD. LINES....659


RETURN BLOCK HYD. LINES....663


2-SECTION VALVE HYD. LINES (SWING MODE / PROPEL SPEED SELECT)....665


2-SECTION VALVE HYD. LINES (FUNCTION CUT / SWING PARKING BRAKE)....667


4-SECTION VALVE HYD. LINES....669


5-SECTION VALVE HYD. LINES....671


8-SECTION VALVE HYD. LINES....673


WINCH HYD. LINES (FOR FRONT&REAR DRUM)....675


WINCH HYD. LINES (FOR BOOM)....679


COOLING HYD. LINES....681


CONNECTOR ASSY (MANIFOLD)....685


CONNECTOR ASSY (WINCH)....687

You will get the following files:
  • TXT (507B)
  • URL-LINK (507B)