Your Cart
Loading

The Construction Scheduler (PDF edition)

On Sale
$19.99
$19.99
Added to cart

November 2026. The project scheduler of a general contractor reads the tenth monthly update of a public building: 94.7 percent complete by value, substantial completion forecast on 28 December 2026 against a contract date of 30 December 2026, after a steel package that in May pointed to 11 January 2027. The schedule everyone signed in January is still telling the truth. This book shows what kept it honest.

The Construction Scheduler is a practitioner's guide to construction scheduling on the contractor's side, in the United States: what the contract asks of the schedule, the breakdown into packages and activities, logic and lags, durations and working calendars with their holidays, the forward and backward passes by hand, total float, the float of a single activity and project float, the critical path, cost loading and the cumulative curves, the baseline review, monthly updates with actual dates and remaining durations, the three-week look-ahead, the narrative, a package that slips, recovery by acceleration or resequencing, and a simple window analysis. One fictional contractor and one fictional public building are followed from the notice to proceed to the tenth update, and every date and float comes from one model. Every form and rule is dated and paraphrased.

Some of what the arithmetic shows: why a network of 63 activities finishes on working day 243 with 8 working days of project float; why the switchgear delivery has 58 days of total float yet cannot slip a day without moving the next crew; why a 20-workday steel delay costs 15 workdays at the finish; why acceleration and resequencing recover 5 workdays each but 9 together; and why the windows of the year add up to exactly the net slip.

The model is not described, it is supplied. Five companion workbooks hold the calendars, run the forward and backward passes on the baseline network, draw the cost curves, follow the monthly updates and the window record, and price the recovery options, by live formula, each with a Checks sheet, and the check-lists come as an editable document. The closing pages say where to find them.

What you will be able to do:

  • Read the schedule requirements of a contract before building anything
  • Break a building into activities a superintendent recognizes
  • Land durations on working calendars, holidays included
  • Run the forward and backward passes and read the float of every activity
  • Load the schedule with cost and read the early and late curves
  • Run a monthly update and write its narrative
  • Price a recovery in days and dollars and keep a window record

Sixteen chapters in five parts and four appendices: a guide to the workbooks with nine exercises, five working check-lists, forty questions for an interview or a schedule review with model answers, and a glossary of sixty-five terms.

Written for schedulers and planning engineers of general contractors and large subcontractors, project engineers and project managers who keep their own schedule, and juniors arriving in the seat. It is not a software manual, and it leaves forensic delay analysis, concurrency, damages, contract drafting and state law to other books. The case, its contractor, its county and their figures are fictional teaching assumptions, not market norms; real-world forms and rules are dated as of November 2026. This book is for education only. It is not legal or contractual advice. Part of The Private Markets Career Guides.

How this book was made: written with the help of artificial intelligence tools, under the author's direction; every figure was computed by a model and every rule was checked against its source.

This edition: PDF, A5, 191 pages, DRM-free.

You will get a PDF (1MB) file