RAMS Pack, Partition Systems
Risk Assessment & Method Statement, written to CDM 2015. Installation of metal or timber stud partition systems, including head and base tracks, studs, noggins, insulation, and preparation for boarding, in accordance with the project specification and manufacturer's system details. Includes full method statement (mobilisation to handover), traffic-light risk assessment (65-85 hazards), COSHH, PPE, permits to work, and emergency procedures. Editable Word document, ready to brand and use.