Contractor Project Pack, Partition Systems
The full Contractor Project Pack, written to CDM 2015 — everything a Principal Contractor typically asks to see before mobilisation. Installation of metal or timber stud partition systems, including head and base tracks, studs, noggins, insulation, and preparation for boarding, in accordance with the project specification and manufacturer's system details. Includes everything in the RAMS Pack, plus registers, competency matrix, ITP, pre-written toolbox talks, 19 appendices (real inspection forms + certificate slots), O&M, QA sign-off and submission checklist. Editable Word document, ready to brand and use.